Trunkline Gas Company, LLC

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 08/01/2003, Docket: RP03-534-000, Status: Effective

Original Sheet No. 116 Original Sheet No. 116 : Effective

 

 

RATE SCHEDULE FSS (Continued)

FIRM STORAGE SERVICE

 

 

2.5 Cycling Requirement

 

If the Stored Volume of Shipper is not reduced to ten percent

(10%) of MCSC or less prior to April 1 of any Contract Year, then

Trunkline shall retain any Stored Volume in excess of ten percent

(10%) of the MCSC.

 

3. RATES

 

The rates and charges for firm service under this Rate Schedule FSS

shall be as follows:

 

3.1 Capacity Charge

 

The monthly Capacity Charge shall be the product of 1/12th the

MCSC and the capacity rate per Dt as set forth on the effective

Tariff Sheet No. 19.

 

3.2 Deliverability Charge

 

The monthly Deliverability Charge shall be the product of the MDWQ

and the deliverability rate per Dt as set forth on the effective

Tariff Sheet No. 19.

 

3.3 Injection Charge

 

The Injection Charge shall be the product of the Quantity of Gas

actually received from Shipper and injected into storage during

the Month and the injection rate per Dt as set forth on the

effective Tariff Sheet No. 19.

 

3.4 Withdrawal Charge

 

The Withdrawal Charge shall be the product of the Quantity of Gas

actually withdrawn from storage and delivered to Shipper during

the Month and the withdrawal rate per Dt as set forth on the

effective Tariff Sheet No. 19.

 

3.5 Range of Rates

 

Unless otherwise agreed to in writing between Shipper and

Trunkline, any rate applicable to Shipper for service hereunder

shall be the applicable Maximum Rate set forth on the effective

Tariff Sheet No. 19, plus all surcharges specified in the General

Terms and Conditions, as may be applicable from time to time. If