Trunkline Gas Company, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2003, Docket: RP03-534-000, Status: Effective
Original Sheet No. 116 Original Sheet No. 116 : Effective
RATE SCHEDULE FSS (Continued)
FIRM STORAGE SERVICE
2.5 Cycling Requirement
If the Stored Volume of Shipper is not reduced to ten percent
(10%) of MCSC or less prior to April 1 of any Contract Year, then
Trunkline shall retain any Stored Volume in excess of ten percent
(10%) of the MCSC.
3. RATES
The rates and charges for firm service under this Rate Schedule FSS
shall be as follows:
3.1 Capacity Charge
The monthly Capacity Charge shall be the product of 1/12th the
MCSC and the capacity rate per Dt as set forth on the effective
Tariff Sheet No. 19.
3.2 Deliverability Charge
The monthly Deliverability Charge shall be the product of the MDWQ
and the deliverability rate per Dt as set forth on the effective
Tariff Sheet No. 19.
3.3 Injection Charge
The Injection Charge shall be the product of the Quantity of Gas
actually received from Shipper and injected into storage during
the Month and the injection rate per Dt as set forth on the
effective Tariff Sheet No. 19.
3.4 Withdrawal Charge
The Withdrawal Charge shall be the product of the Quantity of Gas
actually withdrawn from storage and delivered to Shipper during
the Month and the withdrawal rate per Dt as set forth on the
effective Tariff Sheet No. 19.
3.5 Range of Rates
Unless otherwise agreed to in writing between Shipper and
Trunkline, any rate applicable to Shipper for service hereunder
shall be the applicable Maximum Rate set forth on the effective
Tariff Sheet No. 19, plus all surcharges specified in the General
Terms and Conditions, as may be applicable from time to time. If