Trunkline Gas Company, LLC

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 08/01/2004, Docket: RP04-380-000, Status: Effective

First Revised Sheet No. 86 First Revised Sheet No. 86 : Effective

Superseding: Original Sheet No. 86

RATE SCHEDULE FFZ (Continued)

FLEXIBLE FIELD ZONE TRANSPORTATION

 

 

 

3.3 Surcharges

 

Shipper shall pay all surcharges specified in Section 21

of the General Terms and Conditions and as set forth on the

effective Tariff Sheet No. 15. In addition, the Volumetric

Charges shall include all other applicable surcharges specified in

the General Terms and Conditions and as set forth on the effective

Tariff Sheet No. 15 or which otherwise may be applicable to

service under this Rate Schedule FFZ from time to time.

 

3.4 Range of Rates

 

Unless otherwise agreed to in writing between Shipper and

Trunkline, any rate applicable to a Shipper for service hereunder

shall be the applicable Maximum Rate per Dt as set forth on the

effective Tariff Sheet No. 15, plus all surcharges specified in

the General Terms and Conditions, as may be applicable from time

to time. If an amount less than the applicable Maximum Rate and

not less than the applicable Minimum Rate is agreed upon, such

amount shall be applied prospectively and only to those Points of

Receipt and Points of Delivery identified in writing. Trunkline

shall be responsible for compliance with any reporting

requirements prescribed by the Commission. Trunkline shall not be

required to enter into any Service Agreement for Transportation

service at a rate less than the Maximum Rate per Dt.

 

3.5 Fuel Reimbursement

 

Shipper shall reimburse Trunkline in kind for fuel usage and lost

or unaccounted for Gas. The monthly Fuel Reimbursement shall be

the product of the actual Quantity of Gas received during the

Month and the Fuel Reimbursement percentage as set forth on the

effective Tariff Sheet No. 15.