Transwestern Pipeline Company, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/10/2009, Docket: RP09-156-000, Status: Effective
Second Revised Sheet No. 179 Second Revised Sheet No. 179
Superseding: First Revised Sheet No. 179
GENERAL TERMS AND CONDITIONS
(continued)
30.8 General Terms and Conditions
A. Priority: All released capacity will have priority over
the Transporter's interruptible services.
B. Alternate Points: Alternate Receipt Points and Alternate
Delivery Points may be utilized by a Replacement Shipper as
described in Section 22 of the General Terms and Conditions
of this Tariff.
C. Rates: Releasing Shipper cannot release capacity for an
effective price less than Transporter's minimum rates nor
more than Transporter's just and reasonable maximum rates,
as set forth in Transporter's current FERC Gas Tariff. The
maximum rate that may be charged for capacity released is
the maximum firm rate which may be charged by Transporter
for such transportation, plus Transport Fuel and all
applicable surcharges. Except that no maximum rate limitation
applies to a release of capacity for a period of one year or less if
the release is to take effect on or before one year from the date on
which Transporter is notified of the release.
Releasing Shipper may specify dollars and cents or
percentages of the maximum tariff rate in the
denomination of bids.
Maximum and minimum rates specified by the Releasing
Shipper must include the Reservation Charge and all
demand surcharges.
D. Secondary/Subsequent Releases: Replacement Shipper, and
any third parties receiving capacity rights from any
Replacement Shipper, will be authorized or permitted to
release the capacity to other third parties only under the
same set of conditions described herein, i.e., any
Replacement Shipper will be considered the Releasing
Shipper for purposes of subsequent assignments of capacity,
and any third party receiving such capacity in such
transactions will be considered the Replacement Shipper.