Transwestern Pipeline Company, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2007, Docket: RP06-614-003, Status: Effective
Fourth Revised Sheet No. 147 Fourth Revised Sheet No. 147 : Effective
Superseding: Second Revised Sheet No. 147
GENERAL TERMS AND CONDITIONS
(continued)
22.5 Intra-day Nominations
A. There is no limitation as to the number of intra-day nominations (line items as per NAESB
WGQ Standard 1.2.1) which a service requester may submit at any one standard nomination
cycle or in total across all standard nomination cycles. Such nominations must be
submitted on a currently existing Service Agreement.
B. Shipper shall have ability to nominate on an intra-day basis on Transporter's
system under the following conditions:
1. Intra-day nominations may be used to request an increase or
decrease in scheduled volumes or a change in receipt or delivery points,
consistent with Shipper's Service Agreement. A nomination reduction shall
not result in a revised nomination which is less than the volume of gas
received or delivered on behalf of such Shipper by Transporter on that gas
day.
2. Shipper must obtain prior confirmation from all affected upstream
and downstream Operators.
3. Intra-day nominations will be scheduled only if operationally
feasible.
4. Intra-day nominations do not rollover and are applicable to one (1)
day only.
5. Intra-day nominations may be used to nominate new supply or market.
C. In order to nominate on an intra-day basis, Shipper must submit to Transporter
the information required in Section 22.1. In addition, intra-day nominations
should include an effective time.
D. Firm intra-day nominations are entitled to bump scheduled interruptible service
only during the Evening and Intraday 1 Nomination cycles. Transporter will
provide advance notice of bumping to interruptible shippers. Such notice will be
provided in the same manner in which Transporter provides notice of Operational
Flow Orders. Transporter will provide notification of bumped volumes through the
scheduled quantities statement. Transporter will also electronically communicate
notice directly to bumped Shippers in accordance with the grid-wide timeline for
scheduled quantities.