gas received or delivered and ready verification of the accuracy of measurement. Reasonable
care shall be exercised in the installation, maintenance and operation of any upstream or
downstream pressure regulating equipment which may be installed so as to avoid, so far as
practicable, any inaccuracy in the determination of the quantity of gas received or delivered
hereunder.
5.5 Failure of Meters
In the event a meter fails or is out of service, or registering inaccurately by more than one
percent (1%); the quantity of gas received or delivered hereunder shall be estimated:
A. By using the registration of any check meter or meters if installed and accurately
registering, or, in the absence of (A);
B. By correcting the error if the percentage of error is ascertainable by calibration,
test, or mathematical calculation, or in the absence of both (A) and (B), then;
C. By estimating the quantity of receipts or deliveries during periods under similar
conditions when the meter was registering accurately.
5.6 Test of Meters
The accuracy of Measurer's measuring equipment, including chromatographs, shall be verified at
least quarterly by routine tests (or as otherwise agreed to by the parties), upon reasonable
notice to Non-Measurer, who shall have the right to witness. Non-Measurer shall verify the
accuracy of its check measuring equipment. In the event either party notifies the other that
it desires a special test of any measuring equipment, the parties shall cooperate to secure
prompt verification of the equipment.