Transcontinental Gas Pipe Line Company, LLC
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/30/2009, Docket: RP09-793-000, Status: Effective
First Revised Sheet No. 405 First Revised Sheet No. 405
Superseding: Original Sheet No. 405
GENERAL TERMS AND CONDITIONS
(Continued)
ZONE 6
------
DAILY FACILITY GROUP AND DELIVERY POINT ENTITLEMENTS
----------------------------------------------------
SUNOCO, INC. (R&M)
------------------
Quantities In MMCF/D @ 14.7 PSIA
-----------------------------------------------
Winter Period (1) Summer Period (2)
Facility --------------------- ---------------------
Group Delivery Facility Delivery Facility
Geograph- Point Group Point Group
ical Maximum Maximum Maximum Maximum
Area Delivery Points DPE DPE DPE DPE
--------- ------------------- -------- -------- -------- --------
15 Marcus Hook 40 - 40 -
Sunolin 19 - 17 -
--- --- --- ---
Total - 40 - 40
Total Firm Contract 40.0 (3) 40.0 (4)
Notes:
(1) Winter Period is October through April.
(2) Summer Period is May through September.
(3) Includes presently authorized firm service under Rate Schedule FT. Available firm
quantities limited to individual rate schedule provisions.
(4) Includes presently authorized firm service under Rate Schedule FT. Available firm
quantities limited to individual rate schedule provisions.