ZONE 6

------

DAILY FACILITY GROUP AND DELIVERY POINT ENTITLEMENTS

----------------------------------------------------

PSEG ENERGY RESOURCES AND TRADE, LLC

------------------------------------

(Continued)

 

Quantities In MMCF/D @ 14.7 PSIA

------------------------------------------------

Winter Period (1) Summer Period (2)

Facility --------------------- ----------------------

Group Delivery Facility Delivery Facility

Geograph- Point Group Point Group

ical Maximum Maximum Maximum Maximum

Area Delivery Points DPE DPE DPE DPE

--------- -------------------- -------- -------- -------- --------

19 Bergen (Ridgefield) 212 - 211 -

Paterson 44 - 44 -

Emerson 80 - 31 -

Fairlawn 2 - 1 -

Paramus 181 (20) - 90 (20) -

East Rutherford 247 - 135 -

Harrison 80 - 80 -

Hudson Marion 346 - 242 -

Kearny 68 - 68 -

Essex 100 - 100 -

--- --- --- ---

Total - 649 (5) - 555 (5)

 

Total Firm Contract 1530.3 1045.5

(3,6&9) (4,6&9)

 

Notes: (Certain footnotes refer to Sheet No. 402)

 

(1) Winter Period is October through April.

(2) Summer Period is May through September.

(3) Includes presently authorized firm service under Rate Schedules X-274, X-275, FT, FTF, GSS,

LG-A, LNG, S-2, LSS, SS-1 and FTA. Available firm quantities limited to individual rate

schedule provisions.

(4) Includes presently authorized firm service under Rate Schedules X-274, X-275, FT, FTF, FTA

and GSS. Available firm quantities limited to individual rate schedule provisions.

(5) Includes 70.000 MMCF/D of FT (Market Area) received from Tennessee at Rivervale. To the

extent these volumes are not received the 639 MMCF/D and 545 MMCF/D Facility Group DPE

quantities are reduced correspondingly.

(6) Includes 6.222 MMCF/D delivered for Noble Energy, Inc. under Rate Schedule FT.

(7) The sum of Camden, Camden Paperboard, Brooklawn, Nolte and West Deptford No. 2 may not

exceed 72.

(8) The sum of Camden, Camden Paperboard, Brooklawn, Nolte and West Deptford No. 2 may not

exceed 66.

(9) Includes 5.797 MMCF/D delivered for SLG, Inc. under Rate Schedule FTF.

(10) The sum of Facility Groups 17 and 19 may not exceed 872.

(11) The sum of Facility Groups 17 and 19 may not exceed 724.

(12) The sum of Camden and Camden Paperboard may not exceed 35.

(13) The sum of Camden and Camden Paperboard may not exceed 32.

(14) The sum of Clifton and Montclair State College may not exceed 40.

(15) The sum of Clifton and Montclair State College may not exceed 10.

(16) The sum of Mt. Laurel, Westampton and Burlington may not exceed 218.

(17) The sum of Mt. Laurel, Westampton and Burlington may not exceed 201.

(18) Includes 14.493 MMCF/D delivered for PSEG Power, LLC under Rate Schedule FT.

(19) Includes 24.155 MMCF/D delivered for PSEG Power, LLC under Rate Schedule FT.

(20) Includes 9.662 MMCF/D delivered for PSEG Power, LLC under Rate Schedule FT.