Transcontinental Gas Pipe Line Company, LLC
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/01/2010, Docket: RP10-351-000, Status: Effective
Second Revised Sheet No. 400 Second Revised Sheet No. 400
Superseding: First Revised Sheet No. 400
GENERAL TERMS AND CONDITIONS
(Continued)
ZONE 6
------
DAILY FACILITY GROUP AND DELIVERY POINT ENTITLEMENTS
----------------------------------------------------
PECO ENERGY COMPANY
-------------------
Quantities In MMCF/D @ 14.7 PSIA
----------------------------------------------------
Winter Period (1) Summer Period (2)
Facility ----------------------- -----------------------
Group Delivery Facility Delivery Facility
Geograph- Point Group Point Group
ical Maximum Maximum Maximum Maximum
Area Delivery Points DPE DPE DPE DPE
--------- ------------------- -------- -------- -------- --------
14 West Parkesburg 11 - 8 -
Coatsville 12 - 8 -
--- --- --- ---
Total - 21 - 13
14-L Kennett Square 10 - 6 -
Pottstown 13 - 7 -
--- --- --- ---
Total - 23 - 13
15 Chester 43 - 49 -
Concord 22 - 22 -
--- --- --- ---
Total - 65 - 71
16 West Conshohocken 56 - 35 -
Ivyland 105 - 49 -
U.S. Steel 83 - 79 -
--- --- --- ---
Total - 201 - 163
16-L Oreland 91 - 42 -
--- --- --- ---
Total - 91 - 42
Total Firm Contract 282.5 (3&5) 247.4 (4&5)
Notes:
(1) Winter Period is October through April.
(2) Summer Period is May through September.
(3) Includes presently authorized firm service under Rate Schedules FT, GSS and S-2. Available
firm quantities limited to individual rate schedule provisions.
(4) Includes presently authorized firm service under Rate Schedules FT and GSS. Available firm
quantities limited to individual rate schedule provisions.
(5) Includes 0.219 MMCF/D delivered for Hess Corporation under Rate Schedule FT.