Transcontinental Gas Pipe Line Company, LLC
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/30/2009, Docket: RP09-793-000, Status: Effective
First Revised Sheet No. 399 First Revised Sheet No. 399
Superseding: Original Sheet No. 399
GENERAL TERMS AND CONDITIONS
(Continued)
ZONE 6
------
DAILY FACILITY GROUP AND DELIVERY POINT ENTITLEMENTS
----------------------------------------------------
UGI PENN NATURAL GAS, INC.
--------------------------
Quantities In MMCF/D @ 14.7 PSIA
-----------------------------------------------
Winter Period (1) Summer Period (2)
Facility --------------------- ---------------------
Group Delivery Facility Delivery Facility
Geograph- Point Group Point Group
ical Maximum Maximum Maximum Maximum
Area Delivery Points DPE DPE DPE DPE
--------- ------------------- -------- -------- -------- --------
21 Saylor Avenue 110 - 79 -
Wyoming Monument 18 - 14 -
Dallas 7 - 4 -
Shickshinny 59 - 52 -
Muncy 25 - 32 -
Old Lycoming 18 - 12 -
--- --- --- ---
Total - 220 - 184
Total Firm Contract 219.1 (3,5&6) 183.5 (4,5&6)
Notes:
(1) Winter Period is October through April.
(2) Summer Period is May through September.
(3) Includes presently authorized firm service under Rate Schedules FT, GSS, LSS and SS-2.
Available firm quantities limited to individual rate schedule provisions.
(4) Includes presently authorized firm service under Rate Schedules FT and GSS. Available firm
quantities limited to individual rate schedule provisions.
(5) Includes 21.8 MMCF/D delivered under Rate Schedule X-234.
(6) Includes 3.937 MMCF/D delivered for Enmark Gas Corporation under Rate Schedule FT.