Transcontinental Gas Pipe Line Company, LLC

Fourth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 03/01/2010, Docket: RP10-351-000, Status: Effective

Second Revised Sheet No. 398 Second Revised Sheet No. 398

Superseding: First Revised Sheet No. 398

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

ZONE 6

------

DAILY FACILITY GROUP AND DELIVERY POINT ENTITLEMENTS

----------------------------------------------------

NEW YORK FACILITIES GROUP (5)

-----------------------------

 

Quantities In MMCF/D @ 14.7 PSIA

-------------------------------------------------------------

Winter Period (1) Summer Period (2)

Facility -------------------------- --------------------------

Group Delivery Facility Delivery Facility

Geograph- Point Group Point Group

ical Maximum Maximum Maximum Maximum

Area Delivery Points DPE DPE DPE DPE

--------- ------------------- -------- -------- -------- --------

17 Long Beach 529 (9,16) - 489 (9,16) -

Narrows 336 (6) - 322 (6) -

--- --- --- ---

Total - 689 - 638

 

19 Central Manhattan 731 (10,11,12&17) - 717(10,11,14,15&17)-

Manhattan 484 (13&15) - 410 -

--- --- --- ---

Total - 1017 (6) - 915 (6)

 

 

Total Firm Contract 1594.2 1434.6

(3,7 to 13,15,16&17) (4,7 to 11,14,15,16&17)

Notes:

(1) Winter Period is October through April.

(2) Summer Period is May through September.

(3) Includes presently authorized firm service under Rate Schedules FT, GSS, S-2, LSS, SS-1 and

SS-2, plus the volume of gas in MMCF/D previously flowing under Rate Schedule X-315.

Available firm quantities limited to individual rate schedule provisions.

(4) Includes presently authorized firm service under Rate Schedules FT and GSS, plus the volume

of gas in MMCF/D previously flowing under Rate Schedule X-315. Available firm quantities

limited to individual rate schedule provisions.

(5) Group consists of The Brooklyn Union Gas Company d/b/a National Grid NY, Consolidated Edison

Company of New York, Inc. and KeySpan Gas East Corporation d/b/a National Grid.

(6) The sum of Facility Group 19 and Narrows may not exceed 1,275 MMCF/D during the winter

period and 1,159 MMCF/D during the summer period.

(7) Includes 30.840 MMCF/D delivered for New York Power Authority under Rate Schedule FT

(formerly FT-NT).

(8) Sum of Facility Groups 17 and 19 cannot exceed 1,584 MMCF/D in the winter period and

1,424 MMCF/D in the summer period.

(9) Includes 10.505 MMCF/D for Hess Corporation and 4.831 MMCF/D for NJR Energy Services Company

under Rate Schedule FT.

(10) Includes 9.662 MMCF/D for Consolidated Edison Energy, Inc. under Rate Schedule FT.

(11) Includes 24.155 MMCF/D for KeySpan Gas East Corporation d/b/a National Grid under Rate

Schedule FT.

(12) Includes 33.817 MMCF/D for Washington Gas Light Company under Rate Schedule FT during the

winter period.

(13) Includes 14.493 MMCF/D for Washington Gas Light Company under Rate Schedule FT during the

winter period.

(14) Includes 48.310 MMCF/D for Washington Gas Light Company under Rate Schedule FT during the

summer period.

(15) Includes 24.155 MMCF/D for KeySpan Gas East Corporation d/b/a/ National Grid under Rate

Schedule FT.

(16) Includes 96.6 MMCF/D for KeySpan Gas East Corporation d/b/a National Grid under Rate

Schedule FT that is nominatable on a primary basis to a separate virtual Long Beach

location (Riverside).

(17) Includes 9.662 MMCF/D delivered for Hess Corporation under Rate Schedule FT.