Transcontinental Gas Pipe Line Company, LLC

Fourth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 03/01/2010, Docket: RP10-351-000, Status: Effective

Second Revised Sheet No. 396 Second Revised Sheet No. 396

Superseding: First Revised Sheet No. 396

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

ZONE 6

------

DAILY FACILITY GROUP AND DELIVERY POINT ENTITLEMENTS

----------------------------------------------------

PIVOTAL UTILITY HOLDINGS, INC. (ELIZABETHTOWN GAS COMPANY)

----------------------------------------------------------

 

Quantities In MMCF/D @ 14.7 PSIA

----------------------------------------------------

Winter Period (1) Summer Period (2)

Facility ----------------------- -----------------------

Group Delivery Facility Delivery Facility

Geograph- Point Group Point Group

ical Maximum Maximum Maximum Maximum

Area Delivery Points DPE DPE DPE DPE

--------- ------------------- -------- -------- -------- --------

 

14 Downingtown 2 - 2 -

--- --- --- ---

Total - 2 - 2

 

16 Pennington 10 - 3 -

--- --- --- ---

Total - 10 - 3

 

17 Ford Motors 7 - 3 -

Grandview 40 - 15 -

Cloverleaf 94 - 62 -

--- --- --- ---

Total - 128 - 76

 

19 Erie Street 95 - 56 -

North Avenue 37 - 19 -

--- --- --- ---

Total - 102 - 62

 

20 Clinton 22 - 11 -

Spruce Run 65 - 68 -

New Village #2 107 - 123 -

--- --- --- ---

Total - 168 - 134

 

Total Firm Contract 255.4 (3,5,6&7) 193.5 (4,6&7)

 

 

Notes:

 

(1) Winter Period is October through April.

(2) Summer Period is May through September.

(3) Includes presently authorized firm service under Rate Schedules FT, X-269, X-270, X-276,

GSS, LG-A, LNG, S-2, LSS and SS-1. Available firm quantities limited to individual rate

schedule provisions.

(4) Includes presently authorized firm service under Rate Schedules FT, X-269, X-270, X-276 and

GSS. Available firm quantities limited to individual rate schedule provisions.

(5) Includes 3.300 MMCF/D delivered for Conectiv Energy Supply, Inc. under Rate Schedule FT.

(6) Includes 5.778 MMCF/D delivered for Sprague Energy Corp. previously flowing under Rate

Schedule FT.

(7) Facility Groups 14, 16, 17, 19 & 20 cannot exceed 239 during the winter period and 173

during the summer period.