Transcontinental Gas Pipe Line Company, LLC

Fourth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/31/2008, Docket: RP09-158-000, Status: Effective

Original Sheet No. 391 Original Sheet No. 391

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

 

 

ZONE 5

------

DAILY FACILITY GROUP AND DELIVERY POINT ENTITLEMENTS

----------------------------------------------------

SOUTH CAROLINA PIPELINE CORPORATION

-----------------------------------

 

Quantities In MMCF/D @ 14.7 PSIA

----------------------------------------------------

Winter Period (1) Summer Period (2)

Facility ----------------------- -----------------------

Group Delivery Facility Delivery Facility

Geograph- Point Group Point Group

ical Maximum Maximum Maximum Maximum

Area Delivery Points DPE DPE DPE DPE

--------- ------------------- -------- -------- -------- --------

 

8 Abbeville 16 - 16 -

Anderson 12 - 18 -

--- --- --- ---

Total - 20 - 20

 

9 Moore 33 - 31 -

Deering Milliken 12 - 12 -

Grover 109 (5) - 107 (5) -

--- --- --- ---

Total - 109 - 107

 

 

Total Firm Contract 108.4 (3,5) 106.4 (4,5)

 

 

 

 

 

 

 

Notes:

 

(1) Winter Period is October through April.

(2) Summer Period is May through September.

(3) Includes presently authorized firm service under Rate Schedules FT, GSS and LG-A. Available

firm quantities limited to individual rate schedule provisions.

(4) Includes presently authorized firm service under Rate Schedules FT and GSS. Available firm

quantities limited to individual rate schedule provisions.

(5) Includes 12.473 MMCF/D delivered for Patriots Energy Group under Rate Schedule FT.