Transcontinental Gas Pipe Line Company, LLC

Fourth Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 12/31/2008, Docket: RP09-158-000, Status: Effective

Original Sheet No. 390 Original Sheet No. 390

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

 

ZONE 5

------

DAILY FACILITY GROUP AND DELIVERY POINT ENTITLEMENTS

----------------------------------------------------

CITY OF RICHMOND

----------------

 

 

 

Quantities In MMCF/D @ 14.7 PSIA

-----------------------------------------------

Winter Period (1) Summer Period (2)

Facility --------------------- ---------------------

Group Delivery Facility Delivery Facility

Geograph- Point Group Point Group

ical Maximum Maximum Maximum Maximum

Area Delivery Points DPE DPE DPE DPE

--------- ------------------- -------- -------- -------- --------

 

11-L Emporia 10 - 10 -

--- --- --- ---

Total - 10 - 10

 

12 Waldrop 10 - 10 -

--- --- --- ---

Total - 10 - 10

 

 

Total Firm Contract 10.1 (3) 10.1 (3)

 

 

 

 

 

 

 

 

 

 

 

Notes:

 

(1) Winter Period is October through April.

(2) Summer Period is May through September.

(3) Includes presently authorized firm service under Rate Schedule FT. Available firm

quantities limited to individual rate schedule provisions.