Transcontinental Gas Pipe Line Company, LLC
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/30/2009, Docket: RP09-793-000, Status: Effective
First Revised Sheet No. 380 First Revised Sheet No. 380
Superseding: Original Sheet No. 380
GENERAL TERMS AND CONDITIONS
(Continued)
ZONE 4
------
DAILY FACILITY GROUP AND DELIVERY POINT ENTITLEMENTS
----------------------------------------------------
GEORGIA POWER
-------------
Quantities In MMCF/D @ 14.7 PSIA
-------------------------------------------------
Winter Period (1) Summer Period (2)
Facility ---------------------- ----------------------
Group Delivery Facility Delivery Facility
Geograph- Point Group Point Group
ical Maximum Maximum Maximum Maximum
Area Delivery Points DPE DPE DPE DPE
--------- ------------------- -------- -------- -------- ---------
6 Wansley 261 (4) - 261 (4) -
7 Center-Dahlberg 39 - 39 -
--- --- --- ---
Total - 300 - 300
Total Firm Contract 299.1 (3&4) 299.1 (3&4)
Notes:
(1) Winter Period is October through April.
(2) Summer Period is May through September.
(3) Includes presently authorized firm service under Rate Schedule FT. Available firm
quantities limited to individual rate schedule provisions.
(4) Includes 78.841 MMCF/D delivered for Oglethorpe Power Corp. and 46.377 MMCF/D delivered for
Municipal Electric Authority of Georgia under Rate Schedule FT.