Transcontinental Gas Pipe Line Company, LLC
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/31/2008, Docket: RP09-158-000, Status: Effective
Original Sheet No. 379 Original Sheet No. 379
GENERAL TERMS AND CONDITIONS
(Continued)
ZONE 4
------
DAILY FACILITY GROUP AND DELIVERY POINT ENTITLEMENTS
----------------------------------------------------
ATLANTA GAS LIGHT COMPANY
-------------------------
Quantities In MMCF/D @ 14.7 PSIA
-----------------------------------------------
Winter Period (1) Summer Period (2)
Facility --------------------- ---------------------
Group Delivery Facility Delivery Facility
Geograph- Point Group Point Group
ical Maximum Maximum Maximum Maximum
Area Delivery Points DPE DPE DPE DPE
--------- -------------------- -------- -------- ------- --------
6 Franklin 2 - 2 -
Peachtree 26 - 13 -
Riverdale 160 - 154 -
--- --- --- ---
Total - 188 - 169
7 Stockbridge 315 - 244 -
Lithonia 22 - 14 -
Conyers 22 - 13 -
Bogart 36 - 21 -
Athens 35 - 21 -
East Athens 16 - 16 -
Danielsville 2 - 1 -
--- --- --- ---
Total - 338 - 244
7-L Suwanee 267 - 195 -
--- --- --- ---
Total - 267 - 195
Total Firm Contract 478.6 (3) 380.0 (4)
Notes:
(1) Winter Period is October through April.
(2) Summer Period is May through September.
(3) Includes presently authorized firm service under Rate Schedules FT, GSS, LG-A, LSS and SS-1.
Available firm quantities limited to individual rate schedule provisions.
(4) Includes presently authorized firm service under Rate Schedules FT and GSS. Available firm
quantities limited to individual rate schedule provisions.