Transcontinental Gas Pipe Line Company, LLC
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2010, Docket: RP10-395-000, Status: Effective
Fifth Revised Sheet No. 47 Fifth Revised Sheet No. 47
Superseding: Fourth Revised Sheet No. 47
FIRM TRANSPORTATION SERVICE RATES
UNDER RATE SCHEDULE FT APPLICABLE TO
MARKET LINK EXPANSION PROJECT PHASE II (MARKET LINK)
FIRM TRANSPORTATION SERVICE
Incremental Market Link Annual Firm Transportation
--------------------------------------------------
Maximum Minimum
Daily Rate Daily Rate
---------- ----------
($) ($)
Reservation Rate per dt - Zone 6:
Base Rate 0.38343 0.00000 1/
Electric Power Unit Rate 0.00049 0.00049
------- -------
Total Reservation Rate 0.38392 0.00049
Maximum Minimum
Rate Rate
------- -------
($) ($)
Commodity Rate per dt - Zone 6:
Base Rate 0.00016 0.00016
Electric Power Unit Rate 0.00151 0.00151
------- -------
Total Commodity Rate (excluding ACA) 2/ 3/ 0.00167 0.00167
Keyspan Gas East Corporation's (Keyspan) MarketLink Contract
------------------------------------------------------------
The following recourse rates, which include the applicable Leidy to Long Island charges, shall
apply to Keyspan's MarketLink FT contract demand entitlements (50,000dt/d):
Maximum Minimum
Daily Rate Daily Rate
---------- ----------
($) ($)
Reservation Rate per Dt - Zone 6:
Base Rate 0.38343 0.00000 1/
Electric Power Unit Rate 0.00049 0.00049
Base Rate - Leidy to Long Island - Sta. 210 to Long Island 0.58366 0.00000 1/
Leidy to Long Island - Electric Power Unit Rate - Sta. 207 0.01880 0.01880
------- -------
Total Reservation Rate 0.98638 0.01929
Maximum Minimum
Rate Rate
-------- --------
($) ($)
Commodity Rate per Dt - Zone 6:
Base Rate 0.00016 0.00016
Electric Power Unit Rate 0.00151 0.00151
Base Rate - Leidy to Long Island 0.00000 0.00000
Leidy to Long Island - Electric Power Unit Rate - Sta. 207 0.14539 0.14539
-------- --------
Total Commodity Rate (excluding ACA) 2/ 3/ 0.14706 0.14706
Notes:
1/ The minimum reservation rate applicable to capacity release transactions that are not
permanent releases shall not be less than zero.
2/ Pursuant to Section 27 of the General Terms and Conditions, the Total Commodity Rate shall
be increased to include the ACA unit rate of $0.00190, if applicable.
3/ The Total Commodity Rate applies to upstream or downstream transactions on Buyer's primary
or reverse path.