Transcontinental Gas Pipe Line Company, LLC
Fourth Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2010, Docket: RP10-395-000, Status: Effective
Third Revised Sheet No. 40 Third Revised Sheet No. 40
Superseding: Second Revised Sheet No. 40
FIRM TRANSPORTATION SERVICE RATES
APPLICABLE TO TRANSPORTATION RENDERED PURSUANT TO
RATE SCHEDULE FT AND PART 284 OF THE
REGULATIONS OF THE FERC
Daily Reservation Rate per dt
-----------------------------
Fixed Variable Electric
Receipt & Cost Cost Power Maximum Minimum
Delivery Unit Unit Unit Rate Rate
Zone Rate Rate Rate 1/ 2/ 3/
----------- ------- -------- -------- ------- -------
($) ($) ($) ($) ($)
1-1 0.07175 0.00000 0.00015 0.07190 0.00015
1-2, 2-1 0.09787 0.00000 0.00035 0.09822 0.00035
1-3, 3-1 0.14173 0.00000 0.00066 0.14239 0.00066
1-4, 4-1 0.29973 0.00000 0.00171 0.30144 0.00171
1-5, 5-1 0.41218 0.00000 0.00248 0.41466 0.00248
1-6, 6-1 0.47860 0.00000 0.00297 0.48157 0.00297
2-2 0.07813 0.00000 0.00020 0.07833 0.00020
2-3, 3-2 0.12199 0.00000 0.00051 0.12250 0.00051
2-4, 4-2 0.27999 0.00000 0.00156 0.28155 0.00156
2-5, 5-2 0.39244 0.00000 0.00233 0.39477 0.00233
2-6, 6-2 0.45886 0.00000 0.00282 0.46168 0.00282
3-3 0.09587 0.00000 0.00031 0.09618 0.00031
3-4, 4-3 0.25387 0.00000 0.00136 0.25523 0.00136
3-5, 5-3 0.36632 0.00000 0.00213 0.36845 0.00213
3-6, 6-3 0.43274 0.00000 0.00262 0.43536 0.00262
4-4 0.21001 0.00000 0.00105 0.21106 0.00105
4-5, 5-4 0.32246 0.00000 0.00182 0.32428 0.00182
4-6, 6-4 0.38888 0.00000 0.00231 0.39119 0.00231
4A-4A 0.09094 0.00000 0.00029 0.09123 0.00029
4B-4B 0.07588 0.00000 0.00018 0.07606 0.00018
4B-4A,4A-4B 0.11481 0.00000 0.00047 0.11528 0.00047
5-5 0.16446 0.00000 0.00077 0.16523 0.00077
5-6, 6-5 0.23088 0.00000 0.00126 0.23214 0.00126
6-6 0.11843 0.00000 0.00049 0.11892 0.00049
Gathering Charges
-----------------
In addition to the charges above, the gathering rates on Sheet No. 30 shall apply to quantities
transported through gathering facilities.
Notes:
1/ The Fixed and Variable Cost unit rates plus the Electric Power unit rate.
2/ The Variable Cost unit rate plus the Electric Power unit rate.
3/ The minimum reservation rate applicable to capacity release transactions that are not
permanent releases shall not be less than zero.