Texas Gas Transmission, LLC

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 09/15/2008, Docket: RP08-392-000, Status: Effective

Original Sheet No. 3702 Original Sheet No. 3702 GENERAL TERMS AND CONDITIONS Section 25 (Cont'd) 25.5 Force Majeure: (a) If by reason of force majeure, either party hereto is rendered unable, wholly or in part, to carry out its obligations under this tariff, and if such party gives notice and reasonably full particulars of such force majeure in writing or by telegraph to the other party within a reasonable time after the occurrence of the cause relied on, the obligations of the parties, such notice having been given, so far as and to the extent that they are affected by such force majeure, shall be suspended during the continuance of any inability so caused, but for no longer period; and such cause shall so far as possible be remedied with all reasonable dispatch, except as provided herein. (b) Force Majeure, as used herein shall mean any and all circumstances beyond the direct or reasonable control of either party which would make performance of this service impossible or unsafe, and shall include, without limiting the foregoing, acts of God such as landslides, earthquakes, lightning, storms (including but not limited to hurricanes and hurricane warnings), crevasses, floods, washouts, epidemics; acts of public enemies including wars, riots, blockades; civil and military disturbances; insurrections, fires, explosions, freezing; arrests and restraints of government, either federal or state, civil or military; shutdowns for purposes of necessary or required repairs, relocations, or construction of facilities; any operational or mechanical failure such as breakage or accident to machinery or lines of pipe, or failure of surface equipment or pipelines; the necessity for testing pipeline or other equipment as may be required by governmental authority or as deemed necessary by the testing party for the safe operation thereof; any failure to perform or to comply with any obligation or condition herein due to the inability to obtain necessary supplies, permits, or labor; any industrial disturbance, including strikes or lockouts; or any inability to obtain necessary rights-of-way. (c) Force Majeure affecting the performance hereunder by either party, however, shall not relieve such party of liability in the event of negligence or willful misconduct or in the event of failure to use due diligence to remedy the situation and to remove the cause in an adequate manner and with all reasonable dispatch; and such causes or contingencies affecting such performance shall not relieve either party from its obligations to make payment as determined hereunder. (d) It is understood and agreed that the settlement of strikes, lockouts, or controversies with landowners involving rights-of-way shall be entirely within the discretion of the party having the difficulty and that the above requirement that any force majeure shall be remedied with all reasonable dispatch shall not require the settlement of strikes, lockouts, or controversies with landowners involving rights-of-way, by acceding to the demands of the opposing party which such course is inadvisable in the discretion of the party having the difficulty.