Texas Gas Transmission, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/04/2010, Docket: RP10-360-000, Status: Effective
Third Revised Sheet No. 2103 Third Revised Sheet No. 2103
Superseding: Substitute Second Revised Sheet No. 2103
GENERAL TERMS AND CONDITIONS
Section 9
(Cont'd)
(g) a summary of the allocation of each zone's actual fuel for the
annual period to Rate Schedules NNS, NNL, SGT, SGL, SNS, WNS, FT,
STF, and IT;
(h) a summary of the calculations of the over- and under-collections
of fuel by fuel zone and service type for all transportation
activity;
(i) a summary of the actual and projected throughput factors and fuel;
(j) a summary of projected storage fuel allocated to each service
type;
(k) a summary of the allocation or each fuel zone's projected fuel to
each service type;
(l) a summary of the actual fuel retention percentage calculations
used to obtain the proposed fuel rates;
(m) a narrative explanation and description of all adjustments made to
any of the fuel rates' components, such as throughput, fuel use,
and lost and unaccounted for;
(n) a narrative explanation and description of each projected lost and
unaccounted for (such as fuel blow-down and un-metered storage
fuel), along with detailed information regarding the previous
period's lost and unaccounted for and any lost and unaccounted for
calculations and supporting workpapers;
(o) the monthly Deferred Account balances, along with a comparison of
the Deferred Account balance to net over-/under-collections for
the same period;
(p) a description and reconciliation of the differences between Texas
Gas' annual fuel filing and Form 2;
(q) all supporting workpapers regarding the fuel rates, including but
not limited to the fuel rates for storage service;
(r) detailed information regarding fuel use, including but not limited
to fuel used for other utility operations and known estimated
losses of gas. Texas Gas may, however, file interim proposals
between annual filings subject to approval by the Commission on
less than sixty days notice; and
(s) a summary of the calculation used to determine the swing
allocation methodology hybrid fuel rate for the annual period.
Texas Gas may, however, file interim proposals between annual filings
subject to approval by the Commission with at least thirty days notice.
In addition, for leased capacity from Texas Eastern Transmission, LP,
under which Texas Gas shall incur fuel charges, such fuel charges, which
shall be subject to change from time to time, will be separately stated in
Texas Gas' FERC Gas Tariff on Sheet No. 37, and recovered only from those
parties actually using the leased capacity. Further, for leased capacity
from Gulf South Pipeline Company, LP, under which Texas Gas shall incur
fuel charges, such fuel charges will be separately stated in Texas Gas'
FERC Gas Tariff on Sheet No. 38, and recovered only from those parties
actually using the leased capacity. Texas Gas will update these rates
annually or more frequently, as necessary, as its system fuel rates or
Texas Eastern Transmission, LP's fuel rates change.