Texas Gas Transmission, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/09/2010, Docket: RP10-956-000, Status: Effective
Third Revised Sheet No. 558 Third Revised Sheet No. 558
Superseding: First Revised Sheet No. 558
RATE SCHEDULE SGL (cont'd)
11. Summer Season Provisions
11.1 Texas Gas shall be obligated to deliver to Customer at the city-gate during each
Summer Season up to the Customer's Summer Contract Demand and Adjusted Summer
Quantity Entitlement.
11.2 Pursuant to the provisions set forth below, Customer shall deliver to Texas Gas
during each Summer Season a quantity of gas equal to Customer's Unnominated
Seasonal Quantity or that portion of Customer's Unnominated Seasonal Quantity
actually utilized by Customer during the prior Winter Season (as well as any
Shoulder Month quantities delivered to customer during the Summer Season).
Customer shall reserve and utilize such portion of its Summer Contract Demand as
necessary to redeliver such volumes into storage.
11.3 Maximum Daily Injection Quantity:
To protect the storage formations and allow uniform filling of the storage
reservoirs, Customer will be required to adhere to certain injection limits
(calculated as a percentage of the Unnominated Seasonal Quantity), throughout
the summer injection period. During the Summer Season Customer may, on a daily
basis, inject according to the following table:
% of Unnominated Maximum Available
Seasonal Quantity Injection Rate
Injected (% of USQ)
0% - 65% 1.3%
65% - 90% 1.1%
>90% 0.6%
11.4 Inventory verification tests will be conducted on a semiannual basis. These tests
require the temporary suspension of individual storage field activities
(injections and withdrawals) for a period of approximately two (2) weeks. If
conditions will not permit the full maximum daily injection or withdrawal
quantity, Texas Gas may temporarily adjust the limit and allow make-up quantities
on succeeding days. Texas Gas will provide at least 45 days notice on its
Internet Website in regard to the scheduling of these shut-in periods to allow
Customers to adjust for the interruption of storage.