Texas Gas Transmission, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/15/2008, Docket: RP08-392-003, Status: Effective
Original Sheet No. 553 Original Sheet No. 553
RATE SCHEDULE
SGL
Small Customer General Transportation Service
SGL-SL, SGL-1, SGL-2, SGL-3, and SGL-4
(Customers with SGL Winter Contract Demands of Less than 7,500 MMBtu/d and Total
Firm Contract Demands Not Exceeding 10,000 MMBtu/d)
(Continued)
4.3 Processing Rights
Processing Rights and the transportation of liquids/liquefiables shall be in
accordance with Section 23 of the General Terms and Conditions of this tariff.
4.4 Adjustment of Rates
Texas Gas shall have the right to propose and file with the Commission or other
body having jurisdiction, changes and revisions of any effective rate schedule, or
to propose and file superseding rate schedules, for the purpose of changing the
rate, charges, or other provisions thereof effective as to Customer.
4.5 Secondary Point(s) in Zone Outside Transportation Path
Customer may not designate a secondary point in a zone outside of its
transportation path unless Customer agrees in writing to pay the SGL rate
applicable to such zones as shown on Sheet No. 27A associated with volumes
transported to such zones.