Texas Gas Transmission, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 04/01/2009, Docket: RP00-426-042, Status: Effective
Original Sheet No. 78 Original Sheet No. 78
STATEMENT OF NEGOTIATED RATES
Shipper Name: BP Energy Company (BP Energy)
Contract No.: 28815
Rate Schedule: FT
Time Period(s): April 1, 2010 through December 31, 2018, as well as the first renewal term of two years.
Quantity(ies): 25,000 MMBtu per day
Point(s): Eligible Primary Receipt Point(s): Mountain Home, Meter No. 9071
Twin Groves, Meter No. 9097
Eligible Secondary Receipt Point(s): Other points of interconnection on the Fayetteville Lateral
Eligible Primary Delivery Point(s): Lula, Meter No. 9714
Eligible Secondary Delivery Point(s): NGPL-Bald Knob, Meter No. 9163
MRT-Bald Knob, Meter No. 9799
TETCO-Bald Knob, Meter No. 9533
Any new interconnects with an interstate pipeline on the Fayetteville Lateral
Negotiated Rate(s):
Demand: $0.2400 per MMBtu per day
$0.2800 per MMBtu per day (receipts at Twin Groves, Meter No. 9097)
Commodity: $0.0010 per MMBtu plus applicable ACA surcharge
Fuel: 1.25% per MMBtu
Point Qualification(s): The Negotiated Rates shall apply to transportation service from the Eligible Primary and Secondary Receipt Points to
the Eligible Primary and Secondary Delivery Points.
BP Energy shall pay Texas Gas’ maximum applicable transportation and fuel rates to the extent gas is transported
using a receipt or delivery point other than the eligible Primary and Secondary Receipt and Delivery Points listed
above.
Other: Should Firm Transportation Agreement 28815 be terminated at the end of the Initial Term customer shall,
notwithstanding the fact that it is paying a negotiated or discounted rate, have a contractual right of first refusal
on such terminated portion of its Transportation contract Demand pursuant to Texas Gas’ FERC Gas Tariff with respect
to all or any portion of its Transportation Contract Demand for the first renewal term of two years.
This Negotiated Rate Agreement is applicable to the 2 year contract renewal to the extent the contract renewal is for
the full 25,000 MMBtu per day, unless mutually agreed to otherwise by both parties.