Texas Gas Transmission, LLC

Third Revised Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 04/01/2009, Docket: RP00-426-042, Status: Effective

Original Sheet No. 78 Original Sheet No. 78

 

STATEMENT OF NEGOTIATED RATES

 

Shipper Name: BP Energy Company (BP Energy)

 

Contract No.: 28815

 

Rate Schedule: FT

 

Time Period(s): April 1, 2010 through December 31, 2018, as well as the first renewal term of two years.

 

Quantity(ies): 25,000 MMBtu per day

 

Point(s): Eligible Primary Receipt Point(s): Mountain Home, Meter No. 9071

Twin Groves, Meter No. 9097

Eligible Secondary Receipt Point(s): Other points of interconnection on the Fayetteville Lateral

Eligible Primary Delivery Point(s): Lula, Meter No. 9714

Eligible Secondary Delivery Point(s): NGPL-Bald Knob, Meter No. 9163

MRT-Bald Knob, Meter No. 9799

TETCO-Bald Knob, Meter No. 9533

Any new interconnects with an interstate pipeline on the Fayetteville Lateral

 

Negotiated Rate(s):

Demand: $0.2400 per MMBtu per day

$0.2800 per MMBtu per day (receipts at Twin Groves, Meter No. 9097)

 

Commodity: $0.0010 per MMBtu plus applicable ACA surcharge

 

Fuel: 1.25% per MMBtu

 

 

Point Qualification(s): The Negotiated Rates shall apply to transportation service from the Eligible Primary and Secondary Receipt Points to

the Eligible Primary and Secondary Delivery Points.

 

BP Energy shall pay Texas Gas’ maximum applicable transportation and fuel rates to the extent gas is transported

using a receipt or delivery point other than the eligible Primary and Secondary Receipt and Delivery Points listed

above.

 

Other: Should Firm Transportation Agreement 28815 be terminated at the end of the Initial Term customer shall,

notwithstanding the fact that it is paying a negotiated or discounted rate, have a contractual right of first refusal

on such terminated portion of its Transportation contract Demand pursuant to Texas Gas’ FERC Gas Tariff with respect

to all or any portion of its Transportation Contract Demand for the first renewal term of two years.

 

This Negotiated Rate Agreement is applicable to the 2 year contract renewal to the extent the contract renewal is for

the full 25,000 MMBtu per day, unless mutually agreed to otherwise by both parties.