Texas Gas Transmission, LLC
Third Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/15/2008, Docket: RP08-392-003, Status: Effective
Substitute Original Sheet No. 21 Substitute Original Sheet No. 21
Currently Effective Maximum Daily Demand Rates ($ per MMBtu)
For Service Under Rate Schedule FT
Currently
Effective
Rates [1]
SL-SL 0.0794
SL-1 0.1552
SL-2 0.2120
SL-3 0.2494
SL-4 0.3142
1-1 0.1252
1-2 0.1820
1-3 0.2194
1-4 0.2842
2-2 0.1332
2-3 0.1705
2-4 0.2334
3-3 0.1181
3-4 0.1810
4-4 0.1374
Minimum Rates: Demand $-0-
Backhaul rates equal fronthaul rates to zone of delivery.
[1] Currently Effective Rates are equal to the Base Tariff Rates.
Notes:
- The maximum reservation charge component of the maximum firm volumetric capacity release
rate shall be the applicable maximum daily demand rate herein pursuant to Section 16 of
the General Terms and Conditions.
- For receipts from Enterprise Texas Pipeline, L.P./Texas Eastern Transmission, LP
interconnect near Beckville, Texas, Customer shall pay an incremental Daily Demand
charge of $0.0621. This receipt point is available to those customers agreeing to pay
the incremental rate(s) applicable to such point and is not available for pooling
under Rate Schedule TAPS.
- For receipts from Duke Field Services' Carthage Plant/Gulf South Pipeline Company, LP,
Enbridge Pipelines, L.P./Gulf South Pipeline Company, LP, Energy Transfer Company/Gulf
South Pipeline Company, LP, and Enterprise Texas Pipeline L.P./Gulf South Pipeline
Company, LP interconnects in Panola County, Texas, Customer shall pay an incremental
Daily Demand charge of $0.1288. These receipt points are available to those customers
agreeing to pay the incremental rate(s) applicable to such points and are not available
for pooling under Rate Schedule TAPS.