Tennessee Gas Pipeline Company
FIFTH REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/16/2003, Docket: GT02- 35-004, Status: Effective
Original Sheet No. 366C Original Sheet No. 366C : Effective
GENERAL TERMS AND CONDITIONS (continued)
XVIII. RATE ZONE BOUNDARIES AND INCREMENTAL LATERALS
The boundaries of Transporter's rate zones for purposes of the rate schedules in this
Tariff are as follows:
Louisiana Zone - Zone L - all points on the 500 Line upstream from the suction
side of Station 534 in Purvis, Mississippi, including all points east of mainline
valve 515 in Centerville, Louisiana and all points east of Vermillion 245 C on
the Blue Water Header System; all points on the 800 Line upstream from the
suction side of Compressor Station 834 in Winsboro, Louisiana, including all
points on the west side of mainline valve 515 in Centerville, Louisiana; all
points west of Vermillion 245 C on the southwest and west leg of the Blue Water
Header System; all points on the Kinder-Sabine Line No. 800-1, and all points on
Kinder-Natchitoches Line No. 501-1 south of Station 40 in Natchitoches,
Louisiana.
Texas Zone - Zone 0 - all points on the 100 Line beginning in Texas, including
all points on the Carthage Line No. 701-1, and ending at the suction side of
Compressor Station 40 in Natchitoches, Louisiana.