Tennessee Gas Pipeline Company
FIFTH REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 09/12/1999, Docket: RP99-297-001, Status: Effective
First Revised Sheet No. 320 First Revised Sheet No. 320 : Effective
Superseding: Original Sheet No. 320
GENERAL TERMS AND CONDITIONS (continued)
8.4 PTR Imbalances - Transporter will provide estimates of the Plant
Thermal reduction (PTR) quantities associated with receipts at receipt
points on its system. Estimated PTR quantities will be adjusted to
actual as soon as available. The difference between estimated and
actual PTR quantities will be cashed out at the 0-5% tolerance level,
as specified for the applicable receipt point(s) in Transporter's LMS-
PA Rate Schedule. To the extent that Transporter's estimated PTR
quantities result in Shipper incurring imbalances related to other
components of the gas stream, such imbalances will also be cashed out
at the 0-5% tolerance level as set forth in the LMS-PA Rate Schedule.
In the event Shipper has PTR extracted for its account and has failed
to nominate PTR transportation, then all unnominated PTR quantities
will be cashed out at the 10-15% tolerance level, as specified for the
applicable receipt point(s) in Transporter's LMS-PA Rate Schedule.
9. Reserved for Future Use
10. Availability of Capacity for Firm Services
10.1 Availability of Capacity for Conversion Transportation - Upon the
effective date of the Compliance Filing in Docket No. RS92-23,
capacity in Transporter's pipeline system will be made available to
Shippers which convert from firm sales to firm transportation in
accordance with the following:
(a) Market Area Capacity - A Shipper converting under Rate Schedules
FT-A shall be provided access to mainline capacity downstream of
Station 87 (or upstream of that point where appropriate for
Shippers located upstream of Station 87) in an amount equal to
the amount the Shipper has converted from firm sales to firm
transportation under Rate Schedule FT-A. A shipper converting
under Rate Schedules FT-G or FT-GS shall be provided access to
mainline capacity in an amount equal to its average day
entitlement. The remainder of the FT-G or FT-GS Shipper's MDQ
shall be converted to firm transportation from storage to the
city gate.
(b) Supply Area Capacity - A Shipper converting under Rate Schedules
FT-A, FT-GS or FT-G shall be provided access to mainline
capacity upstream of Station 87 in an amount equal to the amount
of capacity that it is entitled to as general mainline capacity
downstream of Station 87 under Subsection (a). The Shipper
shall be provided a percentage of this total amount on each of