Tennessee Gas Pipeline Company
FIFTH REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2009, Docket: RP09-737-000, Status: Effective
Sixteenth Revised Sheet No. 315 Sixteenth Revised Sheet No. 315
Superseding: Fifteenth Revised Sheet No. 315
GENERAL TERMS AND CONDITIONS (continued)
(l) Notification of Scheduling - The upstream and/or downstream connected
party at the applicable receipt and delivery points will confirm with
Transporter through PASSKEY that Shipper's nominated quantities will be
received or delivered. Nominations other than intra-day or hourly
nominations must be confirmed by the upstream and/or downstream connected
party in accordance with subsections (a) and (b) of this Section 4.
Intra-day and Hourly nominations must be confirmed by the upstream and/or
downstream connected party in accordance with subsections (d) through (i)
of this Section 4. Shipper and applicable upstream and/or downstream
connected party will receive notice from Transporter no later than 4:30
p.m. CCT on the day prior to the commencement of the nominated service
via PASSKEY of scheduled quantities, any nomination made by Shipper that
is not scheduled for delivery, or if any scheduled nomination is amended
or changed by Transporter. Transporter shall also make available at the
end of the day information on scheduled quantities, any intra-day or
hourly nomination made by Shipper that is not scheduled for delivery, or
if any scheduled nomination is amended or changed by Transporter.
(m) Routing of Gas - Scheduling and billing for transportation services will
be determined by the information that Shipper provides Transporter
specifying the daily point-to-point routing of its receipts and
deliveries; provided, however, that unless the parties mutually agree
otherwise the routing for months prior to September 1, 1992 will be
based upon the route reflected on the last invoice for such months. If
actual deliveries are greater than actual receipts, excess deliveries
will be deemed to have been received from Zone 1 for purpose of the
billing for such excess deliveries; provided further that for months
prior to September 1, 1992, the rate for excess deliveries will be based
upon the rate reflected on the last invoice for such months. At points
where Transporter does not measure the quantities delivered, Shipper
shall provide, or cause its supplier or other designee to provide,
Transporter each month a meter statement or reading indicating the
quantities delivered at the point by the fourth working day after each
month of service. These statements shall be provided to:
Tennessee Gas Pipeline Company
1001 Louisiana Street
Houston, Texas 77002
Attention: Gas Measurement Department
At Receipt Points where the gas is processed downstream, Shipper shall
provide, or cause the operator of the processing plant to provide, a
monthly plant allocation statement reflecting the actual plant thermal
reductions from those Receipt Points within 15 days after each month of
service.
NAESB Standard 2.3.26 (Version 1.8) states: The time limitation for
disputes of allocations should be 6 months from the date of the initial
month-end allocation with a 3-month rebuttal period. This standard shall
not apply in the case of deliberate omission or misrepresentation or
mutual mistake of fact. Parties' other statutory or contractual rights
shall not otherwise be diminished by this standard.