Tennessee Gas Pipeline Company
FIFTH REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 03/01/2008, Docket: RP04- 99-004, Status: Effective
Original Sheet No. 307.02 Original Sheet No. 307.02 : Effective
GENERAL TERMS AND CONDITIONS (continued)
(iv) To the extent that it does not create undue risk of an HPD
Problem, Transporter will not apply the Hydrocarbon
Dewpoint limits of this Section to receipts into
Transporter's system from storage facilities and from
meters that are not upstream of a processing plant with
available capacity and that flow 500 dth or less per day.
(v) Transporter will provide as much notice of such limitation
as reasonably practicable and will attempt to provide such
notice at least ten (10) days prior to the effective date
of the limitation.
(vi) Posted Hydrocarbon Dewpoint limitations shall not exceed
the limits needed to correct the specifically identified or
anticipated HDP Problem on specific HDP Segments of
Transporter's system.
(vii) Where the Transporter can not fully correct an HDP Problem
by posting a Hydrocarbon Dewpoint limit in the most
downstream HDP Segment experiencing or anticipating an HDP
Problem, it shall post a Hydrocarbon Dewpoint limit in
subsequent upstream HDP Segment(s) if Transporter
determines that such upstream posting is operationally
necessary. However, the Hydrocarbon Dewpoint limit in the
subsequent HDP Segment(s) may be no stricter than the limit
in the first HDP Segment. Where the Hydrocarbon Dewpoint
of an upstream Monitoring Point complies with the posted
Hydrocarbon Dewpoint limit, Transporter shall not apply any
Hydrocarbon Dewpoint limit to that point or any other
upstream receipt point in the sequential HDP Segment.
(viii) When Transporter posts a Hydrocarbon Dewpoint limit for a
particular HDP Segment, all gas receipts into the affected
HDP Segment either from interconnects or from any adjacent
HDP Segment feeding gas directly into the affected HDP
Segment must meet the posted HDP limit for the affected HDP
Segment.
(ix) Transporter will not require processing of gas at receipt
points upstream of the tailgate of a straddle plant that
meets the posted Hydrocarbon Dewpoint limit without
processing.
(x) To the extent operationally feasible, Transporter shall
allow gas that does not meet a posted Hydrocarbon Dewpoint
limitation at receipt points to continue to flow provided
that Transporter approves a pairing proposal as set forth
in Section 3.1(c).
(xi) Transporter shall allow gas that does not meet a posted
Hydrocarbon Dewpoint limitation at receipt points to
continue to flow provided that the Shipper or a third party
provides to Transporter proof of processing at a plant
within the HDP Segment where the gas at the tailgate of
that plant satisfies the Hydrocarbon Dewpoint limitation
for the applicable HDP Segment.