Tennessee Gas Pipeline Company
FIFTH REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 11/01/2009, Docket: RP09-194-000, Status: Effective
Seventh Revised Sheet No. 304 Seventh Revised Sheet No. 304
Superseding: Sixth Revised Sheet No. 304
GENERAL TERMS AND CONDITIONS (continued)
19. The term "Balancing Agreement" shall mean a contract governing scheduling and
balancing of designated supplies at designated points on Transporter's system, so
that differences between actual flows and scheduled quantities are allocated to
such Balancing Agreement, and shall include (as the context requires) Receipt
Point Balancing Agreements, Delivery Point Balancing Agreements, Pipeline
Balancing Agreements and Balancing Agreements with Aggregators.
20. The term "supply area" shall mean those points on Transporters system that are
upstream of Station 47, 542 or 834 on Transporter's 100, 500, or 800 line,
respectively.
21. The term "supply leg" shall mean the portion of Transporter's 100, 500, or 800 line
within the supply area.
22. The term "market area" shall mean all points on Transporter's system downstream of
Station 47, 542 or 834 on Transporter's 100, 500 or 800 line, respectively.
23. The term "Supply Area Pooling Area" shall mean the following points:
1) 100 Leg - Zone 0 - South: all points of receipt on Transporter's 100 Line
beginning in Texas, and ending at the suction side of Compressor Station
17 in East Bernard, Texas;
2) 100 Leg - Zone 0 - North: all points of receipt on Transporter's 100 Line
beginning at the discharge side of Compressor Station 17 in East Bernard,
Texas, including all points of receipt on the Carthage Line No. 701-1, and
ending at the suction side of Compressor Station 40 in Natchitoches,
Louisiana;
3) 100 Leg - Zone 1: all points of receipt on Transporter's 100 Line
beginning at the discharge side of Compressor Station 40 in Natchitoches,
Louisiana, and ending at the suction side of Compressor Station 87 in
Portland, Tennessee;
4) 500 Leg - Zone 1: all points of receipt on Transporter's 500 Line
beginning at the discharge side of Compressor Station 534 in Purvis,
Mississippi and ending at the 500 Line suction side of Compressor Station
860 in Centerville, Tennessee;
5) 800 Leg - Zone 1: all points of receipt on Transporter's 800 Line
beginning at the discharge side of Compressor Station 834 in Winsboro,
Louisiana and ending at the 800 Line suction side of Compressor Station
860 in Centerville, Tennessee;
6) 500 Leg - Zone L: all points of receipt on Transporter's 500 Line upstream
from the suction side of Station 534 in Purvis, Mississippi, including all
points of receipt east of mainline valve 515 in Centerville, Louisiana and
all points of receipt east of Vermillion 245 C on the Blue Water Header
System;
7) 800 Leg - Zone L: all points of receipt on Transporter's 800 Line upstream
from the suction side of Compressor Station 834 in Winsboro, Louisiana,
including all points of receipt on the west side of mainline valve 515 in
Centerville, Louisiana; all points of receipt west of Vermillion 245 C on
the southwest and west leg of the Blue Water Header System; all points of
receipt on the Kinder-Sabine Line No. 800-1; and all points of receipt on
Kinder-Natchitoches Line No. 501-1 south of Station 40 in Natchitoches,
Louisiana.