Tennessee Gas Pipeline Company
FIFTH REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2004, Docket: RP04-355-000, Status: Effective
Third Revised Sheet No. 177 Third Revised Sheet No. 177 : Effective
Superseding: Second Revised Sheet No. 177
NET RATE SCHEDULE
3.2 Commodity Charge
For each month, the Commodity Charges shall be equal to the product of (1)
the sum of the Commodity Rates shown in the Summary of Rates and Charges
in Transporter's effective Tariff applicable to the rate zone segments
through which Shipper's gas is transported, multiplied by (2) the quantity
of gas delivered by Transporter to Shipper.
3.3 Surcharges
Surcharges shall be equal to the product of (1) the sum of (a) the Annual
Charge Adjustment surcharge and (b) any other applicable surcharges shown
in the Summary of Rates and Charges in Transporter's effective Tariff,
multiplied by (2) the quantities actually delivered by Transporter to
Shipper at the Point of Delivery.
3.4 Incremental Pressure Charge
Additional rates or charges applicable to OSP II and MassPower shall
include an Incremental Pressures Charge as provided in the service
agreement between Transporter and OSP II and between Transporter and
MassPower and as stated in the Summary of Rates and Charges in
Transporter's Tariff.
4. RECEIPT AND DELIVERY POINTS
Shipper's receipt and delivery points are set forth in its Transportation
Contract with associated maximum quantities and minimum pressures. All receipt
points within the same rate zone and supply leg, if applicable, in which
Shipper's Primary Receipt Points are located shall also be available as Secondary
Receipt Points up to the maximum daily quantity that is applicable to the Primary
Receipt Points in that rate zone and supply leg, if applicable.
5. FUEL AND USE
5.1 Shipper shall furnish the quantity of gas required for fuel and losses
associated with rendering transportation services pursuant to this Rate
Schedule. The quantity of gas retained by Transporter for fuel and losses
shall be equal to the quantity of gas scheduled for delivery to
Transporter multiplied by the applicable percentage shown for each
Shipper's service in Article 7 of this Rate Schedule.