Tennessee Gas Pipeline Company
FIFTH REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/1995, Docket: RP95-112-009, Status: Effective
Second Sub First Revised Sheet No. 108 Second Sub First Revised Sheet No. 108 : Effective
Superseding: Original Sheet No. 108
RATE SCHEDULE IS
INTERRUPTIBLE STORAGE SERVICE (continued)
(a) Storage Charge - A monthly Storage Charge which shall be equal to:
Storage Rate Monthly
After Current Weighted
Adjustment X Average Daily
($/Dth) Balance
(Dth)
The daily balance shall be determined by adding the Storage Balance
as of the beginning of each gas day and the injections or transfers
to the Storage Account for that gas day.
(b) Injection and Withdrawal Charge - An Injection Charge which shall be
equal to:
Injection Rate Daily
After Current X Scheduled
Adjustment Injection Quantities
($/dth) (dth)
A Withdrawal Charge which shall be equal to:
Withdrawal Rate Daily Scheduled
After Current X Withdrawal
Adjustment Quantities
($/dth) (dth)
(c) Fuel and Losses - Shipper shall furnish the quantity of gas required
for fuel and losses associated with rendering storage service
pursuant to this Rate Schedule. The quantity of gas retained by
Transporter for fuel and losses shall be equal to:
Quantity of Gas Applicable
Scheduled for Injection X Fuel and Loss
Retention %