Tennessee Gas Pipeline Company

FIFTH REVISED VOLUME NO. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 08/01/1995, Docket: RP95-112-009, Status: Effective

Second Sub First Revised Sheet No. 108 Second Sub First Revised Sheet No. 108 : Effective

Superseding: Original Sheet No. 108

 

 

RATE SCHEDULE IS

INTERRUPTIBLE STORAGE SERVICE (continued)

 

 

(a) Storage Charge - A monthly Storage Charge which shall be equal to:

 

Storage Rate Monthly

After Current Weighted

Adjustment X Average Daily

($/Dth) Balance

(Dth)

 

 

The daily balance shall be determined by adding the Storage Balance

as of the beginning of each gas day and the injections or transfers

to the Storage Account for that gas day.

 

(b) Injection and Withdrawal Charge - An Injection Charge which shall be

equal to:

 

Injection Rate Daily

After Current X Scheduled

Adjustment Injection Quantities

($/dth) (dth)

 

A Withdrawal Charge which shall be equal to:

 

Withdrawal Rate Daily Scheduled

After Current X Withdrawal

Adjustment Quantities

($/dth) (dth)

 

(c) Fuel and Losses - Shipper shall furnish the quantity of gas required

for fuel and losses associated with rendering storage service

pursuant to this Rate Schedule. The quantity of gas retained by

Transporter for fuel and losses shall be equal to:

 

Quantity of Gas Applicable

Scheduled for Injection X Fuel and Loss

Retention %