6. EXCUSE OF PERFORMANCE

 

6.1 If Transporter fails to tender for delivery on any one or more days the

quantity of natural gas which Shipper has scheduled for receipt at the FS

Service Point, up to the maximum quantity which Transporter is obligated

by the FS Service Agreement to deliver to Shipper, then the charges as

otherwise computed hereunder shall be reduced by an amount equal to:

 

(Scheduled Volumes - Tendered Volumes) x (Deliverability Rate After

Current Adjustment x (12 x MDWQ) / MSQ)

 

If Transporter's failure to perform is due to a force majeure event as

set forth in Article X of the General Terms and Conditions of

Transporter's FERC Gas Tariff, Transporter will not be obligated to

reduce Shipper's charges, in the manner described above for failure to

tender delivery at a primary or secondary delivery point(s). If

Transporter's failure to perform is due to a routine, non-emergency

maintenance event as set forth in Article X of the General Terms and

Conditions of Transporter's FERC Gas Tariff, Transporter will not be

obligated to reduce Shipper's charges, in the manner described above, for

failure to tender delivery at a secondary delivery point(s) if Shipper

re-nominates and Transporter re-schedules delivery to Shipper's primary

delivery point(s).

 

7. AUTHORIZED OVERRUNS

 

7.1 Injection/Withdrawal Quantities - Upon request of Shipper, Transporter

may receive or redeliver quantities of gas in excess of Shipper's MDIQ or

MDWQ under this Rate Schedule if, in Transporter's sole judgement,

operating conditions permit such overrun ("Authorized Overruns")

provided, however, that in no event is Shipper allowed to withdraw gas in

excess of Shipper's Storage Balance at the time of the request, nor

inject gas in excess of Shipper's Maximum Storage Quantity.

 

NAESB Standard 1.3.19 (Version 1.8) states: Overrun quantities should be

requested on a separate transaction. Therefore, all Shipper requests for

Authorized Overrun injections or withdrawals must be nominated through

PASSKEY or by fax when necessary.

 

Any service interruption associated with Authorized Overruns will be

scheduled in accordance with Article III, Section 6 of the General Terms

and Conditions of Transporter's FERC Gas Tariff. Shipper shall pay

Transporter the applicable Authorized Overrun Charge as set forth herein

on all Authorized Overrun volumes in excess of the applicable daily

quantity; provided that Authorized Overrun Charges shall not apply to that

portion of a Shipper's Authorized Overrun injection volumes that when

combined with Shipper's firm injection nominations at the FS Service Point

do not exceed Shipper's Maximum Daily Withdrawal Quantity. Provided

further that if the quantities in excess of Shipper's MDIQ or MDWQ were

scheduled in order to make up for prior