RATE SCHEDULE FS
FIRM STORAGE SERVICE (continued)
6. EXCUSE OF PERFORMANCE
6.1 If Transporter fails to tender for delivery on any one or more days the
quantity of natural gas which Shipper has scheduled for receipt at the FS
Service Point, up to the maximum quantity which Transporter is obligated
by the FS Service Agreement to deliver to Shipper, then the charges as
otherwise computed hereunder shall be reduced by an amount equal to:
(Scheduled Volumes - Tendered Volumes) x (Deliverability Rate After
Current Adjustment x (12 x MDWQ) / MSQ)
If Transporter's failure to perform is due to a force majeure event as
set forth in Article X of the General Terms and Conditions of
Transporter's FERC Gas Tariff, Transporter will not be obligated to
reduce Shipper's charges, in the manner described above for failure to
tender delivery at a primary or secondary delivery point(s). If
Transporter's failure to perform is due to a routine, non-emergency
maintenance event as set forth in Article X of the General Terms and
Conditions of Transporter's FERC Gas Tariff, Transporter will not be
obligated to reduce Shipper's charges, in the manner described above, for
failure to tender delivery at a secondary delivery point(s) if Shipper
re-nominates and Transporter re-schedules delivery to Shipper's primary
delivery point(s).
7. AUTHORIZED OVERRUNS
7.1 Injection/Withdrawal Quantities - Upon request of Shipper, Transporter
may receive or redeliver quantities of gas in excess of Shipper's MDIQ or
MDWQ under this Rate Schedule if, in Transporter's sole judgement,
operating conditions permit such overrun ("Authorized Overruns")
provided, however, that in no event is Shipper allowed to withdraw gas in
excess of Shipper's Storage Balance at the time of the request, nor
inject gas in excess of Shipper's Maximum Storage Quantity.
NAESB Standard 1.3.19 (Version 1.8) states: Overrun quantities should be
requested on a separate transaction. Therefore, all Shipper requests for
Authorized Overrun injections or withdrawals must be nominated through
PASSKEY or by fax when necessary.
Any service interruption associated with Authorized Overruns will be
scheduled in accordance with Article III, Section 6 of the General Terms
and Conditions of Transporter's FERC Gas Tariff. Shipper shall pay
Transporter the applicable Authorized Overrun Charge as set forth herein
on all Authorized Overrun volumes in excess of the applicable daily
quantity; provided that Authorized Overrun Charges shall not apply to that
portion of a Shipper's Authorized Overrun injection volumes that when
combined with Shipper's firm injection nominations at the FS Service Point
do not exceed Shipper's Maximum Daily Withdrawal Quantity. Provided
further that if the quantities in excess of Shipper's MDIQ or MDWQ were
scheduled in order to make up for prior