Tennessee Gas Pipeline Company
FIFTH REVISED VOLUME NO. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/1995, Docket: RP95-112-009, Status: Effective
Second Sub 2nd Revised Sheet No. 95A Second Sub 2nd Revised Sheet No. 95A : Effective
Superseding: 1st Revised Sheet No. 95A
RATE SCHEDULE FS
FIRM STORAGE SERVICE (continued)
3.2 Natural gas receipts and redeliveries by Transporter under this Rate
Schedule shall not be subject to curtailment or interruption or
discontinuance, except as may be excused in accordance with Article X of
the General Terms and Conditions of the FERC Gas Tariff. Such curtailment
or interruption shall be imposed upon Shippers in accordance with Article
III, Section 6 of the General Terms and Conditions of the FERC Gas Tariff.
Conditional Deliverability entitlements shall be subject to the conditions
of Section 3.4 of this Rate Schedule.
3.3 The quantity of gas in Shipper's FS storage account at any time shall be
Shipper's Storage Balance at that time and shall not exceed Shipper's
Maximum Storage Quantity ("MSQ"). Transporter shall be ready at all times
to redeliver to Shipper and Shipper shall have the right at all times to
receive from Transporter natural gas at daily rates up to the Maximum
Daily Withdrawal Quantity, provided that the withdrawal quantity equals
the FS gas scheduled for transportation pursuant to Shipper's
transportation agreements with Transporter or with a third party
transporter, as applicable, from the FS Service Point.
Transporter shall accept in any one day for injection into Transporter's
underground storage facilities for Shipper's account a quantity of gas
equal to Shipper's Maximum Daily Injection Quantity, except as provided in
Section 7.1 of this Rate Schedule. Transporter shall withdraw in any one
day from Transporter's underground storage facilities for Shipper's
account a quantity of gas equal to Shipper's Maximum Daily Withdrawal
Quantity as determined in Section 3.4 of this Rate Schedule.
3.4 A shipper electing Conditional Deliverability entitlements shall have
Conditional Deliverability stated in its Service Agreement in separate
Ratchet 0, I and II quantities. The following conditions shall apply to
Shipper's withdrawal rights utilizing Conditional Deliverability.
(a) Withdrawal Level Inventory Level
Ratchet 0 > 30% - 100%
Ratchet I > 20% - 30%
Ratchet II > 0% - 20%
Inventory level is the ratio of Shipper's Storage Balance to Shipper's
Maximum Storage Quantity.
(b) Shipper shall maintain a minimum Storage Balance greater than or
equal to 15% of its Maximum Storage Quantity from November 1 to March
1. Customers withdrawing below the minimum Storage Balance prior to