Central Kentucky Transmission Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 08/01/2008, Docket: RP08-123-000, Status: Effective
Second Revised Sheet No. 355 Second Revised Sheet No. 355 : Pending
Superseding: First Revised Sheet No. 355
for FTS RATE SCHEDULE) Revision No.________
Appendix A to Service Agreement No. ____________
Under Rate Schedule ________
between Central Kentucky Transmission Company (Transporter)
and ________________________________________ (Shipper)
Transportation Demand
Begin Date End Date Transportation Demand Dth/Day Recurrence Interval
Primary Receipt Point
Maximum
Scheduling Scheduling Measuring Measuring Daily Recurrence
Begin End Point Point Point Point Quantity Interval
Date Date No. Name No. Name (Dth/day)
_____ _____ _____ ________ ________ ________ ________ ________
_____ _____ _____ ________ ________ ________ ________ ________
Minimum Receipt Point Pressure: 1/
Primary Delivery Point
Maximum
Scheduling Scheduling Measuring Measuring Daily Recurrence
Begin End Point Point Point Point Quantity Interval
Date Date No. Name No. Name (Dth/day)
_____ _____ _____ ________ ________ ________ ________ ________
_____ _____ _____ ________ ________ ________ ________ ________
Minimum Delivery Point Pressure: 1/
Hourly Flow at Delivery Point Commitment/Restriction: 2/
1/ If a minimum pressure is not specifically stated, then Transporter's
obligation shall be as stated in Section 13 (Delivery Pressure) of the
General Terms and Conditions.
2/ If an hourly flow commitment or restriction is not specifically
stated, then Transporter's obligation shall be as stated in Section 9
(Operating Conditions) of the General Terms and Conditions.