Steuben Gas Storage Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 10/01/2002, Docket: RP02-429-001, Status: Effective
Substitute Third Revised Sheet No. 14 Substitute Third Revised Sheet No. 14 : Effective
Superseding: Second Revised Sheet No. 14
RATE SCHEDULE FS
FIRM STORAGE
(Continued)
(e) COMPETITIVE BIDDING PROCEDURE. Bids may be submitted by
potential Replacement Customers via the Internet Site during
the posting period. Seller shall post the terms of each
complete bid, but will not post the identity of the bidder.
Posted bids will be accessible via EDM. Seller will also
require all information set forth in Section 2 of the General
Terms and Conditions of this tariff. Potential Replacement
Customer bids for capacity release transactions for one year or
longer may not exceed the maximum rates as stated on sheet No.
5 of this Original Volume No. 1. Upon expiration of the offer,
Seller shall remove such offer of release from its Internet
Site.
Potential Replacement Customers may withdraw their posted bids
at any time during the bidding period via the Internet Site or
EDM. Potential Replacement Customers cannot withdraw bids after
the bidding period ends. Such potential Replacement Customers
may not post another bid for the same capacity lower than their
previous bid.
Seller will post offers and bids, including prearranged deals,
upon receipt. A Releasing Customer may request a later posting
time for posting of such offer, and Seller will support such
request insofar as it comports with the standard Capacity
Release timeline in Section 7.1(d).