Southwest Gas Storage Company
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/20/1991, Docket: CP90-1014-002, Status: Effective
Original Sheet No. 69 Original Sheet No. 69 : Superseded
RATE SCHEDULE FSS (Continued)
FIRM STORAGE SERVICE
6.9 Curtailment and Interruption
Seller shall have the right to curtail, interrupt or
discontinue service in whole or in part on its system from
time to time and at any time, under the following conditions
and in the following manner:
(a) Operating or Remedial Curtailment or Interruption may
be ordered by Seller at any time if in Seller's
judgment capacity or operating conditions so require or
it is desirable or necessary to make modifications,
repairs or operating changes, the conduct of which will
be affected thereby, upon such notice as is reasonable
under the circumstances and in the following order, to
the extent practicable: (1) interruptible storage
service shall be first curtailed, commencing with
service that at the time notice was given was being
charged at a rate that is less than the maximum rate of
Seller then in effect under this tariff in sequence
starting with the rate least proximate to the maximum
rate and then with service which was initially provided
most proximate to the date notice is given by the
Seller of the particular curtailment or interruption;
next in order shall be all other interruptible storage
service in sequence starting with service which was
initially provided most proximate to the date notice is
given by Seller of the particular curtailment or
interruption. In the event Buyer is receiving
service at less than the applicable maximum rate and
Seller determines that interruption or curtailment of
service is required, Seller shall notify Buyer that
Buyer will be required to pay the applicable maximum
rate in order to avoid interruption or curtailment of
service to the extent that any interruptible service
is available as determined by Seller. Buyer's
election to pay the applicable maximum rate shall be
a one-time election effective during such periods of
interruption or curtailment regardless of duration.
Buyer's election shall be made at the time Seller and
Buyer agree to such discounted rate. (2) Firm
storage service shall be curtailed last on a pro-rata
basis. Such proration shall be based on Seller's
maximum firm contractual obligations to provide firm
service.