Southwest Gas Storage Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/23/2009, Docket: RP09-248-000, Status: Effective
Fourth Revised Sheet No. 124 Fourth Revised Sheet No. 124
Superseding: Third Revised Sheet No. 124
GENERAL TERMS AND CONDITIONS
(Continued)
6. CAPACITY RELEASE (Continued)
(2) For biddable releases (more than 1 year)
The timeline is the same as biddable releases for less
than 1 year except that the Releasing Shipper shall post
the Shipper Notice on the Messenger® system by 12:00
p.m. Central Time four (4) Business Days before award.
Open season ends no later than 1:00 p.m. Central Time on
the Business Day before timely nominations are due (open
season is three Business Days).
(3) Timeline for Releases with Special Conditions
If the Releasing Shipper specifies a bid evaluation
methodology other than highest rate, net revenue or
present value, or a permanent release or any other
special conditions, the above timelines shall apply;
provided, however, one additional Business Day will be
added to the evaluation period. Such extended
evaluation period shall cause gas flow to be at least
one day later than gas could flow under the timeline set
forth in Section 6.4(B)(1) or Section 6.4(B)(2).
(C) All bids must be expressed in dollars and cents or percents
of Maximum Rate, whichever is stated in the Shipper Notice,
include the required bid information and must be received and
posted electronically through the Messenger® system. Bids
shall be posted on the Messenger® system with any
contingencies identified and with the bidder's identity
deleted.
(D) A bidder may submit only one bid at a time in response to a
Shipper Notice. A bidder may withdraw its bid through the
Messenger® system at any time prior to the close of the
posting period specified in the Shipper Notice without
prejudice to its submitting another bid with an economic
value equal to or greater than the economic value of the
withdrawn bid.
(E) Where there is a PRS and a bid which is better than the bid
submitted by the PRS, Southwest shall notify the PRS by
2:00 p.m. Central Time on the Day capacity is awarded and the
PRS will have until 2:30 p.m. to match the better bid and
obtain the right to the released capacity.