Southwest Gas Storage Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 02/23/2009, Docket: RP09-248-000, Status: Effective
Third Revised Sheet No. 120 Third Revised Sheet No. 120
Superseding: Second Revised Sheet No. 120
GENERAL TERMS AND CONDITIONS
(Continued)
6. CAPACITY RELEASE (Continued)
(5) The period of time or term of the release;
(6) The conditions of Releasing Shipper's right of recall as
well as methods and rights associated with returning the
previously recalled capacity to the Replacement Shipper,
if applicable;
(7) Whether contingent bids will be accepted and when the
contingency must be removed;
(8) The identity of a Pre-arranged Replacement Shipper
(PRS), if applicable;
(9) The minimum rate expressed in dollars and cents or
percentage of Maximum Rate, term, and quantity of
capacity Releasing Shipper shall accept, if any, and
whether bids using a volumetric rate for the collection
of Capacity and Deliverability Charges will be accepted
and whether Releasing Shipper requires a volumetric
commitment. The maximum volumetric rate that may be bid
shall not exceed the one hundred percent (100%) load
factor equivalent of the maximum Capacity and
Deliverability reservation rates. Southwest shall
support volumetric releases with volumetric commitments
by fully accounting for volumetric and reservation
components, consistent with the rules and regulations
enunciated by the Commission. The maximum reservation
rate that may be bid shall not exceed the Maximum Rate
for the applicable service being released as set forth
on the applicable currently effective tariff sheets.
Notwithstanding the above, no rate limitation shall
apply to a capacity release for a period of one year or
less if the release is to take effect on or before one
year from the date on which Southwest is notified of the
release;
(10) The duration of the posting which may not be less than
the minimum bid period specified in Section 6.4(B)
herein;