Southwest Gas Storage Company
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/15/1999, Docket: RP00- 58-000, Status: Effective
Original Sheet No. 23 Original Sheet No. 23 : Effective
RATE SCHEDULE FSS (Continued)
FIRM STORAGE SERVICE
3. RATE
The rates and charges for firm service under this Rate Schedule FSS
shall include the applicable storage rate components per Dt as
described in Sections 3.1, 3.2 and 3.3.
3.1 Storage Charges
For Storage service rendered to Shipper under this Rate Schedule
FSS, Shipper shall pay Southwest each Month the sum of the
following charges as set forth on the effective Tariff Sheet No. 5
of this Tariff:
(A) Capacity Charge
The monthly capacity charge per Dt is determined by
multiplying the Maximum Annual Quantity (MAQ) by the Capacity
Charge rate, divided by twelve.
(B) Deliverability Charge
The monthly deliverability charge per Dt is determined by
multiplying the Maximum Daily Withdrawal Quantity (MWQ) by
the monthly Deliverability Charge rate.
(C) Injection Charge
The injection charge shall be equal to the applicable
injection rate multiplied by the Quantity injected into
Southwest's facilities by Shipper, as provided for in Section
2.2, during any Month.
(D) Withdrawal Charge
The withdrawal charge shall be equal to the applicable
withdrawal rate multiplied by the Quantity withdrawn from
Southwest's facilities, as provided for in Section 2.3,
during any Month.