Venice Gathering System, L. L. C.

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 01/01/1998, Docket: CP97-533-002, Status: Effective

Original Sheet No. 177 Original Sheet No. 177 : Effective

 

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

17.18 Installation of Flow Control Equipment

 

VGS may construct, install, and operate flow control

equipment, telemetry equipment or electronic flow computers

at any location on its System whenever VGS determines in its

reasonable judgment that such equipment will contribute to

the safe, reliable, efficient and orderly operational

integrity of its System.

 

17.19 Regulatory Precedence

 

Nothing in Section 16 or 17 shall require VGS to file

an application for a certificate of public convenience and

necessity under Section 7(c) of the Natural Gas Act. VGS

reserves the right to seek a waiver of the policy set forth

herein, for good cause shown, during any proceeding before

the FERC instituted under Section 7 of the Natural Gas Act.

VGS reserves the right to change its rates or any of the

provisions of its General Terms and Conditions at its

discretion, subject to receiving the necessary approvals,

either through a Section 4 Rate filing or other appropriate

means.