Venice Gathering System, L. L. C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/01/1998, Docket: CP97-533-002, Status: Effective
Original Sheet No. 177 Original Sheet No. 177 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
17.18 Installation of Flow Control Equipment
VGS may construct, install, and operate flow control
equipment, telemetry equipment or electronic flow computers
at any location on its System whenever VGS determines in its
reasonable judgment that such equipment will contribute to
the safe, reliable, efficient and orderly operational
integrity of its System.
17.19 Regulatory Precedence
Nothing in Section 16 or 17 shall require VGS to file
an application for a certificate of public convenience and
necessity under Section 7(c) of the Natural Gas Act. VGS
reserves the right to seek a waiver of the policy set forth
herein, for good cause shown, during any proceeding before
the FERC instituted under Section 7 of the Natural Gas Act.
VGS reserves the right to change its rates or any of the
provisions of its General Terms and Conditions at its
discretion, subject to receiving the necessary approvals,
either through a Section 4 Rate filing or other appropriate
means.