Venice Gathering System, L. L. C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/01/1998, Docket: CP97-533-002, Status: Effective
Original Sheet No. 173 Original Sheet No. 173 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
17.15 Installation, Ownership, Operation and
Maintenance of Metering Facilities at Receipt
Points
VGS shall not be required to construct any facilities
in order to render service hereunder. Unless otherwise
agreed, VGS, at its election, will construct, install, own,
maintain and operate lateral pipelines and metering
facilities properly equipped with orifice meters and other
necessary measuring equipment required to measure the
quantities of gas received into VGS' System or delivered
from VGS' System. The metering and regulating facilities
are to be installed at a location that, in VGS' reasonable
judgment, is practical, convenient and readily accessible.
The Operator/Shipper shall provide the exhibits necessary to
support any needed FERC proceedings or permits required by
any other governmental agency. Unless otherwise agreed, VGS
may require the Operator/Shipper to contribute an
aid-to-construction amount to VGS up to the cost of the
facilities, including all costs involved in the filing of
applications, pursuing approvals and obtaining all licenses
and permits required for transportation services or
construction, and further, amounts necessary to reimburse
any costs, including any income taxes that may be incurred
by VGS as a result of the aid-to-construction contribution.
Shippers, whether new or existing, shall bear all costs and
expenses attributable to the construction or acquisition of
any lateral pipelines or expansions of existing lateral
pipelines or measurement facilities.
The installation, ownership, operation and
maintenance of the Metering Facilities at the Receipt Points
shall be subject to the following: