Venice Gathering System, L. L. C.
Original Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/01/1998, Docket: CP97-533-002, Status: Effective
Original Sheet No. 168 Original Sheet No. 168 : Effective
GENERAL TERMS AND CONDITIONS
(Continued)
b. Error Correction, < 1.0%: If, during any
test of the measuring equipment, an
adjustment or calibration error is found
which results in an incremental
adjustment to the calculated hourly flow
rate which does not exceed the one
percent (1.0%) limit as described in part
(a) of this Section, or if the total
measurement adjustment during a Month is
less than 500 MMBTU, all prior recording
shall be considered to be accurate for
quantity determination purposes. Any
measuring equipment found to be measuring
inaccurately in any percentage shall be
adjusted at once to read accurately.
17.7 Special Test
In the event Shipper desires a Special Test (a test
not scheduled by Measuring Party under the provisions of
Section 17.4 above) of any measuring equipment, reasonable
advance notice, in writing, shall be given to Measuring
Party and both parties shall cooperate to secure a prompt
test of the accuracy of such equipment. If the measuring
equipment falls within the accuracy provisions of Section
17.6 above, and if the measurement equipment meets all
appropriate specifications of Section 17.8, Shipper shall
bear the cost of such Special Test. If the measuring
equipment does not fall within the accuracy provisions of
Section 17.6 above, or if the measurement equipment does not
meet all appropriate specifications of Section 17.8,
Measuring Party shall bear the cost of such Special Test,
and Measuring Party shall also bear the costs to promptly
repair or replace the defective equipment.