Venice Gathering System, L. L. C.

Original Volume No. 1

 Contents / Previous / Next / Main Tariff Index

 

 

Effective Date: 09/01/2005, Docket: RP05-430-000, Status: Effective

Second Revised Sheet No. 104 Second Revised Sheet No. 104 : Effective

Superseding: First Revised Sheet No. 104

 

GENERAL TERMS AND CONDITIONS

(Continued)

 

b. VGS will support the following allocation methodology types at all

points: Ranked, Pro Rata, Percentage, Swing, and operator provided

value. VGS will not limit the number of PDA allocation

methodologies that may be used during an allocation period. A new

PDA may be required when a nomination changes; provided, however,

a PDA for a partial Day will not be permitted if it would result

in a change in quantities allocated for flow prior to submittal of

the new PDA. If an OBA is in effect at a point, a PDA is not

required to be submitted. VGS will post on its Internet Home Page

those Point(s) of Receipt and Delivery where an OBA is in effect.

 

c. VGS will report daily operational allocations within one business

day after the end of the gas day in which gas has flowed. If the

best available data for reporting daily operational allocations is

the scheduled quantity, VGS will use the scheduled quantity for

the daily operational allocation.

 

This standard applies to the daily provision of operational

allocated quantities whether they are provided pursuant to NAESB

WGQ Standard 2.4.3 or NAESB WGQ Standard 2.4.4.

 

Upon request to VGS, a Service Requester (SR) will be provided

operational allocated quantities pursuant to NAESB WGQ Standard

2.4.3 or 2.4.4 for the transaction(s) that have been scheduled by

VGS for the SR.

 

VGS can agree to send the operational allocated quantities on a

daily basis to a SR rather than accept the Upload of Request for

Download for operational allocated quantities.

 

VGS is not required to support requests for operational allocated

quantities other than on an "all locations for an SR basis."

Where VGS has determined to support this standard in a manner

other than:

 

a) providing specific operational allocated quantities in

response to a request for same, or

 

b) providing operational allocated quantities on an "all

locations for an SR basis," then the SR can rely on the

absence of a line item(s) provided by VGS as indicative that

the particular line item(s)' scheduled quantities are

operational allocated quantities.