Mogas Pipeline LLC (Fomerly Missouri Interstate Gas)
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/26/2009, Docket: RP09-185-001, Status: Effective
Second Revised Sheet No. 61 Second Revised Sheet No. 61
Superseding: First Revised Sheet No. 61
GENERAL TERMS AND CONDITIONS
(Continued)
6. Procedures for requesting service (continued)
4. Minimum capacity or minimum percentage of the total posted
capacity which bidder is willing to accept;
5. Contingencies, if any.
(b) Bid amounts. All bids must be submitted in amounts which a
bidder agrees to pay to Transporter for the right to receive firm service,
including undiscounted reservation surcharges, if applicable. Such bids will
exclude Transporter's commodity charges and commodity surcharges applicable to
such service included in Transporter's rates, which rate components must be
paid to Transporter by the successful bidder in addition to the bid amounts.
Unless Transporter is willing to consider Negotiated Rate bids, the maximum
rates which may be bid will be the maximum tariff rates as they may vary from
time to time for the applicable service. The minimum rates which may be bid
will be the minimum tariff rates as they may vary from time to time for the
applicable service, or the minimum rates Transporter specifies on the posting,
which will never be less than the minimum tariff rates.
(c) Withdrawal of bid. A bidder may withdraw its bid at any time
prior to close of the bid period; provided, however, that if the bidder is a
pre-arranged Shipper, it may not withdraw its bid. A bidder that withdraws
its bid may not then submit another bid with a lower economic value for the
same capacity.
(d) Creditworthiness. All bidders must comply with Section 3 of
Rate Schedule FT. Bidders must submit a request for prequalification for
credit in order to expedite the award process. If, on or before the bid close
date, a bidder fails to pre-qualify for a credit limit equal to or greater
than the economic value of its bid, Transporter may disregard such bid and,
subject to Section 6, choose the bid with the next highest economic value
submitted by a creditworthy bidder.
6.9 Awarding
(a) As soon as reasonably practical, but no later than five (5)
business days following the bid close date, Transporter will evaluate the bids
received and determine the winning bid, subject (where applicable) to Section
6. Bids will be evaluated based on the net present value of the bid for all bid periods
of 72 hours or less. For bid periods longer than 72 hours, bids will be evaluated based
on either the net present value or the alternative criteria for determining economic value
that is specified by Transporter in its posting.