Mogas Pipeline LLC (Fomerly Missouri Interstate Gas)
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 01/26/2009, Docket: RP09-185-001, Status: Effective
Original Sheet No. 58.1 Original Sheet No. 58.1
Superseding: First Revised Sheet No. 58
GENERAL TERMS AND CONDITIONS
(Continued)
6. Procedures for requesting service (continued)
the capacity will be held or will otherwise be posted for bids under the expansion; (e) the
projected in-service date of the expansion project; and (f) on a rolling basis, how much of
the reserved capacity has been sold on a limited-term basis. For any reserved capacity
associated with an expansion project that does not go forward within the one (1) year
period, the unreserved capacity will be posted for bidding on Transporter’s Internet
Website within thirty (30) days of the date the capacity becomes available. Solicitation
of turned-back capacity will occur within ninety (90) days or less of an open season for
the expansion project.
6.5 Transporter shall maintain a log of all firm transportation requests.
6.6 Any modification, in whole or in part, of an existing service shall be requested
by Shipper's submission of a new service request form with a notation on the form that the
service requested is a modification of an existing service. Such modification request
shall not be treated as a request for new service if the modification involves the same
degree of firmness, and no reduction in the rate to be paid by Shipper.
6.7 Allocation of Capacity
If at any time Transporter has transportation capacity available which will
support additional firm services, then Transporter may conduct an Open Season and post the
availability of such capacity and make such capacity available for firm service(s). An
Open Season shall be the period of time during which Transporter will receive bids for the
posted capacity provided that if no acceptable bids are received Transporter shall be free
to negotiate with any potential Rate Schedule FT shipper. Such period of time shall be
posted with the notice of capacity. The allocation of such capacity among firm services
shall be determined pursuant to this provision.