Mississippi Canyon Gas Pipeline, LLC
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/20/1998, Docket: CP96-159-006, Status: Effective
Original Sheet No.300 Original Sheet No.300 : Effective
FORM OF RESERVE COMMITMENT AGREEMENT
(cont'd)
Section 2.2 - (cont'd)
Shipper's interests in the Committed Field(s) and such
assignees shall receive a proportionate assignment of
the rights and obligations hereunder with respect to
the Committed Field(s) so assigned, to the extent that
such assignee satisfies the requirements of Section 6.3
of Transporter's Rate Schedules FT-1, FT-2 or IT-1, as
applicable. Upon such assignment, Shipper shall be
relieved of its obligations under this Agreement to the
extent, and only to the extent, so assigned to a third
party.
2.3 From the obligations in Section 2.1, Shipper expressly
reserves unto itself, its successors and assigns, the
following rights and quantities of production
sufficient to satisfy such rights:
(a) The right to operate the Committed Field(s) free
from any control by Transporter including, without
limitation, the right (but never the obligation)
to drill new wells, to repair and rework old
wells, to plug and abandon any well and to renew,
surrender, release or terminate any lease (in
whole or in part) covering the affected lands;
(b) The right to deliver production to lessors of
leases on such lands in quantities sufficient to
fulfill lease obligations from time to time,
including the right to take royalty in kind;
(c) The rights to use production for development and
operations of such lands, including (but not
limited to) the use of gas for fuel, drilling
(including gas drilling), deepening, reworking,
compressing, gas lifting, processing, treating,
cycling, repressuring or other supplemental
recovery operations; and
(d) To process gas for the extraction of any
components other than methane contained therein,
except for such methane reasonably removed in such
processing.