Mississippi Canyon Gas Pipeline, LLC
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/20/1998, Docket: CP96-159-006, Status: Effective
Original Sheet No.90 Original Sheet No.90 : Effective
GENERAL TERMS AND CONDITIONS (cont'd)
10. INSTALLATION OF FLOW CONTROL EQUIPMENT
Transporter may elect to construct, install, and operate
flow control equipment at any location on Transporter's
Facility whenever it determines in its reasonable judgment
that such equipment will contribute to the safe, reliable,
efficient, and orderly operation of Transporter's Facility
in a manner that is consistent with its obligations to
provide service under all of its Rate Schedules.