Mississippi Canyon Gas Pipeline, LLC
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 07/01/1999, Docket: CP99-175-002, Status: Effective
First Revised Sheet No. 83 First Revised Sheet No. 83 : Effective
Superseding: Original Sheet No.83
GENERAL TERMS AND CONDITIONS (cont'd)
6. PRESSURE
6.1 Receipt Point(s):
All gas to be transported for Shipper shall be
delivered to Transporter at pressures sufficient to
enter Transporter's Facility at such working pressures
maintained by Transporter at each Receipt Point;
provided, however, that such pressures shall not exceed
Transporter's maximum allowable operating pressures at
each such point. Transporter shall operate its system
so that the pressure at each Receipt Point shall not
exceed the Maximum Receipt Point Pressure as follows:
West Delta 143 A 1325 psig
West Delta 143 Mensa 1325 psig
6.2 Delivery Point(s):
Gas will be delivered by Transporter at each Delivery
Point on Exhibit "A" to the Transportation Service
Agreement at the working pressures maintained by
Transporter from time to time, but not greater than the
Maximum Delivery Point Pressure as follows:
Venice Gas Plant 1050 psig
Southern Natural Gas Co. 1050 psig
Texas Eastern Transmission Co. 1050 psig
Tennessee Gas Pipeline Co. 1050 psig