Mississippi Canyon Gas Pipeline, LLC
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/20/1998, Docket: CP96-159-006, Status: Effective
Original Sheet No.34 Original Sheet No.34 : Effective
RATE SCHEDULE IT-1
INTERRUPTIBLE TRANSPORTATION SERVICE (Cont'd)
respect of the Shipper under the Federal
Bankruptcy Act or any other applicable federal or
state law, or appointing a receiver, liquidator,
assignee, trustee, sequestrator (or other similar
official) of the Shipper or of any substantial
part of its property, or the ordering of the
winding-up or liquidation of its affairs, with
said order or decree continuing unstayed and in
effect for a period of sixty (60) consecutive
days.
6.4 Modification of Service
Any modification of an existing transportation
service under Rate Schedule IT-1 shall be
requested by Shipper's submission of a new Service
Request Form included in Transporter's FERC Gas
Tariff with a notation on the form that the
service requested is a modification of an existing
service. Such modification shall be effective
after the request for service has been fully
processed and accepted by Transporter.
7. GENERAL TERMS AND CONDITIONS
Shipper shall provide Transporter with such information as
is needed to meet the requirements placed on Transporter
pursuant to 18 CFR Part 284. The General Terms and
Conditions specified in Volume No. 1 of Transporter's FERC
Gas Tariff are incorporated as part of this Rate Schedule.