Mississippi Canyon Gas Pipeline, LLC
First Revised Volume No. 1
Contents / Previous / Next / Main Tariff Index
Effective Date: 12/20/1998, Docket: CP96-159-006, Status: Effective
Original Sheet No.15 Original Sheet No.15 : Effective
RATE SCHEDULE FT-1
FIRM TRANSPORTATION SERVICE (cont'd)
6.4(b) Payment for Service - (cont'd)
p.m. CDT on July 1, 1996) after Transporter
tendered it, Transporter shall consider the
request for service invalid and retain the entire
amount of the prepayment and interest (if
applicable).
(c) If Transporter determines that firm capacity is
not available to satisfy a request for service,
then Transporter shall so notify the Shipper in
writing, and the entire amount of the prepayment
shall be refunded, with interest.
6.5 Modification of Service
Any modification of an existing transportation service
under Rate Schedule FT-1 shall be requested by
Shipper's submission of a new Service Request Form
included in Transporter's FERC Gas Tariff with a
notation on the form that the service requested is a
modification of an existing service. Such modification
shall be effective after the request for service has
been fully processed and accepted by Transporter.
7. GENERAL TERMS AND CONDITIONS
Shipper shall provide Transporter with such information as
is needed to meet the requirements placed on Transporter
pursuant to 18 CFR Part 284. The General Terms and
Conditions specified in Volume 1 of Transporter's FERC Gas
Tariff are incorporated as part of this Rate Schedule.