RATE SCHEDULE FT-1
FIRM TRANSPORTATION SERVICE (cont'd)
6.2 A request for transportation service must include the
following:
(a) Gas Quantities: The Maximum Daily Quantity
applicable to each Receipt Point(s) and Delivery
Point(s) stated in Mcf and the estimated total
quantities to be received and transported over the
term, as defined in section 6.2(c) below. All
stated MDQ's shall be uniform for each month
within the term.
(b) Receipt/Delivery Point(s): The designated Receipt
Point(s) and Delivery Point(s) for the requested
transportation together with the name of the
entity delivering gas to Transporter and the name
of the entity to receive the gas from Transporter.
(c) Term: The proposed commencement and termination
dates of service; provided that the primary term
shall not be less than one year.
(d) Shipper Certification: A statement by the Shipper
certifying that all necessary upstream and
downstream arrangements will be in place on the
date the transportation service is to commence and
that Shipper will have title to the gas to be
delivered to Transporter.
(e) Facilities: Identification and location of any
facilities to be constructed or installed by any
party affected by the proposed transportation
service.
6.3 Credit Evaluation
(a) Any person seeking new service from Transporter
under Rate Schedule FT-1 must provide in priority
order:
(i) A copy of Shipper's audited financial
statements for the most recent twelve months
or Annual Report and Form 10-K; or if not
available.